Opportunity

PIEE #W912DR26BA010

Maintenance Dredging Services for North East River, Cecil County, MD

Buyer

USACE W2SD Endist Baltimore

Posted

July 13, 2026

Respond By

August 13, 2026

Identifier

W912DR26BA010

NAICS

237990

This opportunity from the U.S. Army Corps of Engineers, Baltimore District, focuses on maintenance dredging in the North East River, Cecil County, Maryland. - Government Buyer: - U.S. Army Corps of Engineers, Baltimore District (W2SD ENDIST BALTIMORE) - Project Scope: - Maintenance dredging of up to 100,000 cubic yards of silty to sandy material - Authorized dredging depth: 7 feet, with 2 feet of allowable over depth - Use of hydraulic cutterhead pipeline dredge required - Dredged material transported via pipeline (approx. 6 miles) to upland placement site - Pipeline route crosses North East River, Stony Run creek, tidal and nontidal wetlands - Products/Services Requested: - Dredging service (no specific equipment brands or part numbers specified) - Unique/Notable Requirements: - Submission of Material Safety Data Sheet (MSDS) with offers (FAR Clause 52.223-3) - Dredging permitted only during a defined window - Construction duration: approx. 120 calendar days from Notice to Proceed - No OEMs or vendors are specified in the solicitation.

Description

The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.This invitation for bid has five (5) attachments.

View original listing