Opportunity

Ontario Planet bids #SM2301

Ontario, CA Fourth Street Storm Drain, Water Main, and Street Improvements Project (SM2301)

Posted

July 08, 2026

Respond By

July 28, 2026

Identifier

SM2301

NAICS

237110, 237310, 237990

This opportunity involves major public infrastructure improvements for the City of Ontario, CA: - Government Buyer: - City of Ontario Public Works Department (Engineering/Development) - OEMs and Vendors Mentioned: - Powerseal (Powerseal 3690AS tapping sleeve) - Jensen Infrastructure (manhole components) - Products/Services Requested: - Installation of reinforced concrete pipes (RCP) ranging from 18” to 60” (6,280 linear feet) - Catch basins and storm drain manholes (with Jensen Infrastructure components) - CML&C water mains (6'' to 8''), service laterals, water valves, fire hydrants - Construction of Portland Cement Concrete (PCC) curb and gutter, ADA-compliant ramps, asphalt concrete paving - Street signing and striping, tree planting - Powerseal 3690AS tapping sleeve (approved for AC, DI, and PVC pipe) - Services Requested: - Traffic control and safety measures, construction survey, preconstruction audio/video documentation - Stormwater Pollution Prevention Plan (SWPPP) and Best Management Practices (BMPs) - As-built record drawings, potholing and utility verification, trench shoring, clearing and grubbing - Unique/Notable Requirements: - Bidders must hold a Class "A" contractor license and be registered for public works - Strict adherence to materials testing, stormwater pollution prevention, and water shutdown coordination - Electronic bid submission, bid bond, performance and payment bonds required - Liquidated damages of $9,500 per calendar day for delays - Extensive technical specifications and geotechnical reports provided - Project value estimated at $13 million; completion required within 360 working days

Description

This project involves comprehensive street and utility improvements including traffic control, clearing and grubbing, demolition within the public Right-of-Way, and utility coordination. The work includes installation of reinforced concrete pipes (RCP) ranging from 18" to 60", catch basins, storm drain manholes, water mains from 6" to 8", service laterals, water valves, fire hydrants, and construction of PCC curb and gutter, ADA ramps, AC paving, signing and striping, and tree planting. The project is to be completed within 360 working days with liquidated damages of $9,500 per calendar day. Bidders must submit electronic bids and attend a pre-bid meeting scheduled for June 23, 2026.

View original listing