Opportunity
PIEE #W912EK26BA017
Water Infrastructure Improvements at Arlington Heights Army Reserve Center
Buyer
USACE MVD Rock Island District
Posted
July 14, 2026
Respond By
July 30, 2026
Identifier
W912EK26BA017
NAICS
236210, 237110, 237990, 238910
This opportunity involves water infrastructure improvements at the Arlington Heights 88th Readiness Division, COL. P. Schulstad U.S. Army Reserve Center in Illinois. - Government Buyer: - US Army Corps of Engineers, Rock Island District (W07V ENDIST ROCK ISLAND) - OEMs and Vendors: - No specific OEMs or vendors are named in the notice - Products/Services Requested: - Demolition of existing water infrastructure - Directional drilling and trenching for new water lines - Installation of new water connections to the Village of Arlington Heights watermain - Installation of water service and main lines, gate valves, vaults, meters, and boxes - Chlorination testing of new water lines - Removal and capping of existing fire hydrants; installation of new fire hydrants - HMA patching of ACC pavement, concrete sidewalk and drive repairs - Investigation and repair of a leaking abandoned watermain - Seeding and restoration of disturbed areas - Option A: Additional excavation and plugging of the existing connection - Unique/Notable Requirements: - Set aside for 8(a) businesses - No specific products, part numbers, or quantities provided - Work must comply with local water utility standards and Army Reserve Center requirements
Description
The US Army Corps of Engineers - Rock Island District intends to solicit for competitive bids under RFO part 14 for the following requirement.DISCLAIMER: THIS IS A PRE-SOLICITATION NOTICE. ANY INFORMATION OR SUBMITTALS RECEIVED IN RESPONSE TO THIS NOTICE WILL NOT BE EVALUATED.PROJECT LOCATIONThe work is located at the Arlington Heights 88th Readiness Division, COL. P. Schulstad U.S. Army Reserve Center, with a physical address of 1515 West Central Road, Arlington Heights, Cook County, Illinois, and as indicated.SUMMARY OF WORKBase BidThe Base bid work includes, but is not limited to, demolition; directionaldrilling; trenching; installing a new water connection to the Village ofArlington Heights watermain; installing a water service and main lines;installing gate valves, vaults, meters, and boxes; chlorination testing ofthe new water system; removing and capping fire hydrants; installing newfire hydrants; HMA patching of ACC pavement; repairing concrete sidewalksand drives; investigating and repairing a section of leaking previouslyabandoned watermain; seeding disturbed areas; and site restoration.Option AThe work for Option A includes, but is not limited to, demolition;directional drilling; excavation; installing a new water connection to theVillage of Arlington Heights watermain; plugging the existing connection;installing gate valves, vaults, meters, and boxes; chlorination testing ofthe new water system; HMA patching of ACC pavement; repairing concretesidewalks and drives as needed; seeding disturbed areas; and siterestoration.