Opportunity
North Carolina eVP #121-071426JVC-S202
Ceiling Tile Replacement and Corridor Repainting at Rowan-Cabarrus Community College South Campus Building S202
Posted
July 14, 2026
Respond By
August 27, 2026
Identifier
121-071426JVC-S202
NAICS
238310, 238320
Rowan-Cabarrus Community College is seeking bids for ceiling tile and grid replacement, as well as corridor wall repainting, in South Campus Building S202. - Government Buyer: - Rowan-Cabarrus Community College, South Campus, Facilities/College Environment office - OEMs (Original Equipment Manufacturers): - Armstrong - USG - Chicago Metallic Corporation - CertainTeed - Products/Services Requested: - Demolition and replacement of acoustical ceiling tiles (2'x2', mineral based) - Basis of design: Armstrong Tundra, USG Frost ClimaPlus - Mold/mildew inhibitor, high light reflectance (LR 0.83), NRC 0.70, CAC 40+ - Installation of new ceiling grid suspension systems - Acceptable manufacturers: Armstrong, USG, Chicago Metallic - Wide face, double web, steel, hot-dip galvanized, prefinished 15/16 flanges, intermediate duty, white - Repainting of all corridor walls on three levels with college-specified and approved color in eggshell finish - Unique/Notable Requirements: - Compliance with College Facilities Design Manual and North Carolina Building Code - Licensed North Carolina contractors required - Mandatory pre-bid conference and bid bond - Maintain campus access and coordinate construction sequencing to minimize disruption - Verification and correction of above-ceiling infrastructure (IT cabling, HVAC, fire alarm, lighting) - Warranties and submittals per college standards
Description
This solicitation is for the partial demolition and replacement of existing ceiling tiles and grids in South Campus Building S202 at Rowan-Cabarrus Community College. The work includes verification and corrections for existing above ceiling infrastructure and independent structural support for non-compliant anchoring or support of IT cabling, HVAC ductwork, fire alarm devices, lighting, and other concealed conditions. Installation of new ceiling grid and tiles is required to realign with existing HVAC and lighting, which may need additional support. Additionally, corridor walls on three levels will be repainted with college-specified colors. The project requires compliance with the college's Facilities Design Manual and North Carolina Building Code requirements.