Opportunity

C.E. Gleeson Constructors Inc. Procureware #E26-176

Relocation and Reinstallation of 12,800 SF Pre-Engineered Metal Building for Crown Enterprises

Posted

July 13, 2026

Respond By

July 23, 2026

Identifier

E26-176

NAICS

236210, 236220, 238190, 238290

This opportunity involves the relocation and reinstallation of a 12,800 square foot pre-engineered metal building (PEMB) for Crown Enterprises in Detroit, MI. - Government Buyer: - Gleeson Constructors (acting as construction manager for Crown Enterprises) - Products and Services Requested: - Relocation and reinstallation of a 12,800 SF PEMB - Sitework, demolition, and removal of existing structures - Concrete slab and foundation work (concrete supplied by owner) - Structural and miscellaneous metals - Rough carpentry, millwork, plastic paneling, insulation - Sheet metal flashing, glazing, hollow metal and steel doors, door hardware, overhead doors - Painting, gypsum board assemblies, acoustical ceilings, sealed concrete, epoxy flooring - Toilet accessories and partitions, fire protection specialties, interior signage, lockers - Residential appliances - Fire protection systems installation - Plumbing (meters, valves, piping, fixtures, water coolers) - HVAC (supports, insulation, piping, ducts, packaged equipment, split-system air conditioners, waste oil furnace, exhaust fans, controls) - Electrical (site electrical, raceways, grounding, lighting, fire alarm, power systems, energy management controls, commissioning) - Unique or Notable Requirements: - Open shop/non-prevailing wage - Pre-bid meeting at the current PEMB location - OEMs and Vendors: - No specific OEMs or manufacturers are named in the solicitation

Description

This solicitation is for the relocation of a 12,800 square foot pre-engineered metal building including sitework for PEMB in Detroit, MI. The project includes various construction divisions such as general requirements, existing conditions, concrete, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, special construction, fire protection, plumbing, HVAC, electrical, and more. The project is open shop/non-prevailing wage with a pre-bid meeting scheduled. The project start is planned for September 2026.

View original listing