The Air Force Test Center at Edwards Air Force Base is seeking qualified sources for a turnkey upgrade and integration of the EGW control system at Building 1030. - Government Buyer: - United States Air Force, Air Force Test Center (AFTC), Edwards Air Force Base, California - Scope of Work: - Turnkey installation, programming, and commissioning of the EGW control system - System engineering and programming, including: - PLC logic development - HMI/SCADA configuration - Cybersecurity compliance (Risk Management Framework - RMF) - Installation and hardware integration: - Panel assembly - On-site implementation - Wiring and labeling - Testing and commissioning: - Site acceptance testing - System cut-over - Verification of automated sequences and alarms with government representatives - Requirements: - Full support for all project areas - Compliance with RMF cybersecurity guidelines - Provision of all management, labor, equipment, and materials - No specific OEMs, vendors, or part numbers are mentioned - NAICS code: 334513 (Instruments and Related Products for Measuring, Displaying, and Controlling Industrial Process Variables)

Description

Description(s): EDWARDS AFB SOURCES SOUGHT FOR TRIMAX CONTROLS SYSTEM INTEGRATION & AUTOMATION UPGRADE

THIS IS A MARKET SURVEY FOR INFORMATION ONLY. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPISIS. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SYNOPSIS OR ANY FOLLOW-UP INFORMATION REQUESTS. THE PURPOSE OF THIS SYNOPSIS IS TO GAIN KNOWLEDGE OF POTENTIALLY QUALIFIED SOURCES AND THEIR SIZE CLASSIFICATIONS (SMALL BUSINESS, LARGE BUSINESS, ETC.). PLEASE DO NOT REQUEST A COPY OF A SOLICITATION, AS ONE DOES NOT EXIST.  

1. Purpose. The United States Air Force is conducting market research to identify capable sources for the turnkey installation, programming, and commissioning of the EGW control system at Building 1030, Edwards Air Force Base (EAFB), California. The selected contractor will be required to provide all management, labor, equipment, and materials necessary to successfully execute the scope of work described herein.

2. Requirement.

SCOPE OF WORK:

System Engineering and Programming PLC Logic Development: The contractor shall engineer and program the Programmable Logic Controllers (PLCs) to accurately control the designated facility equipment (e.g., pumps, valves, and generators) in accordance with the approved sequence of operations. HMI/SCADA Configuration: The contractor shall develop and deploy the Human- Machine Interface (HMI) screens. The graphical interface must provide operators with real-time equipment status, historical data trending, and immediate visual/audible alarming for critical system faults. Cybersecurity & Compliance: All software configurations and network integration shall adhere to current Risk Management Framework (RMF) guidelines. The contractor must ensure that default passwords are changed, unnecessary ports are disabled, and role-based access controls are implemented. Installation and Hardware Integration Panel Assembly: The contractor shall assemble, wire, and label all internal components of the control panels prior to site delivery. All wiring must be clearly labeled and correspond directly to the provided schematic drawings. On-Site Implementation: The contractor shall physically install the upgraded components, terminate field wiring, and establish network connectivity without causing uncoordinated disruptions to ongoing facility operations.

Testing and Commissioning Site Acceptance Testing (SAT): Following installation, the contractor shall conduct a comprehensive SAT alongside government representatives. This includes point-to-point loop checks, verification of all automated sequences, and simulated fault testing to ensure alarms trigger correctly. System Cut-Over: The contractor shall manage the transition from the legacy system to the new system, ensuring continuous utility support during the cut-over phase

3. Information requested. The Government requests interested offerors furnish the following information if they can FULLY support this requirement:

a. Company name, SAM Unique Entity ID (UEI) and Cage Code, address, points of contact, phone numbers and e-mail addresses.

b. Information should include a brief description of experience in providing the items and services specified above. The information package must be clear, concise, and complete. The Air Force is under no obligation to provide feedback to the company, or to contact the company for clarification of any information submitted in response to this request.

c. Identification of business size (small or large) and identify the socioeconomic disadvantaged category, as defined in RFO 19 and currently listed in the System for Award Management (SAM). Small business size standards are published by the U.S. Small Business Administration (SBA) and may be found at www.sba.gov/size/sizetable2002.html. The potential North American Industry Classification System (NAICS) codes assigned to this procurement is 334513 “Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables”. The Small Business Size Standard is 750 employees.

d. Any other information deemed useful to the Air Force.  Information packages should be limited to no more than 3 pages.

4.  Inquiries. Qualified and interested offerors responding to this announcement must be able to support all areas. NO partial support responses from industry will be accepted.

The due date and time for responses to this Sources Sought is 9:00 AM Pacific Daylight Time on Thursday 16 July 2026.