Opportunity
Lake Tahoe Unified School District Planet bids #26-301600086-01-BN1
El Dorado Beach Revetment Phase 2 Construction Project – Shoreline Protection and Drainage Improvements
Posted
July 10, 2026
Respond By
July 30, 2026
Identifier
26-301600086-01-BN1
NAICS
237990
This opportunity is for the El Dorado Beach Revetment Phase 2 construction project in South Lake Tahoe, managed by the City of South Lake Tahoe Department of Public Works. - Government Buyer: - City of South Lake Tahoe Department of Public Works - Project Scope: - Removal of existing 12-inch corrugated metal pipe (CMP) storm drain pipes (125 units) - Removal of Super Sack sandbags and plastic from the beach, with salvage of rock and sand - Salvage and reuse of sand (150 units) and cobble rock (110 units) as infill for rock riprap - Installation of infiltration pits (40 units) for drainage improvements - Placement of various classes of riprap for shoreline protection: - 450 tons of Class V Rock Slope Protection (RSP) - 80 tons of Class II RSP - 900 units of rounded 18 to 36 inch boulders for revetment - 390 units of 3 to 8 inch river run cobble - Import and placement of 350 tons of washed beach sand (free of aquatic invasive species) - Construction staking, surveying, and mobilization - Temporary traffic control and site management - Installation, maintenance, and removal of temporary best management practices (BMPs), including a contractor-supplied 225 linear foot water-filled dam for site isolation and sediment control - Removal of 2,650 units of loose filter fabric from existing riprap - Notable Requirements: - Strict compliance with environmental permits and California Air Quality Control Board equipment emissions standards - Adherence to California prevailing wage laws - Erosion control, noise restrictions, and protection of existing vegetation and improvements - Liquidated damages for delays - Project duration is 35 calendar days from Notice to Proceed, with excavation/grading restricted to May 1 through October 15 - No specific OEMs or commercial vendors are named in the solicitation documents.
Description
This solicitation is for the El Dorado Beach Revetment Phase 2 project in South Lake Tahoe, California. The work includes removal of existing 12-inch CMP storm drain pipes, removal of Super Sack sandbags, removal and salvage of sand and riprap on the beach, installation of various classes of riprap as new revetment, beach replenishment, installation of an infiltration pit, traffic control, and installation, maintenance, and removal of temporary BMPs including a temporary water-filled dam/barrier. The project also involves utility protection and coordination, compliance with regulatory permits, and adherence to contract documents including project construction drawings, bid documents, special provisions, and applicable standards. A mandatory pre-bid meeting is scheduled for July 16, 2026, and bids must be submitted by July 30, 2026.