Opportunity

South Dakota City of Brookings Civic Plus #2026 - 019

Construction of Pre-Engineered Steel SRE Building at Brookings Regional Airport

Posted

July 13, 2026

Respond By

July 30, 2026

Identifier

2026 - 019

NAICS

236220, 238910, 237990

This opportunity involves the construction of a Snow Removal Equipment (SRE) Building at Brookings Regional Airport, South Dakota, managed by the City of Brookings. - Government Buyer: - City of Brookings, City Council, Office of the City Clerk, and Brookings Regional Airport (Airport Manager's Office) - Project Scope: - Construction of a 37'-8" x 63'-8" pre-engineered steel SRE building, including footings, foundations, and domestic water plumbing - Comprehensive site work: mobilization, excavation (1,000 CuYd), disposal of excess material (100 CuYd), aggregate base course (370 CuYd), geotextile separator fabric (780 SqYd), and topsoil (75 CuYd) - Stormwater management: 80 Ft of 12" reinforced concrete pipe (RCP), 1 RCP flared end, 1 connection to existing storm sewer inlet, 2 inlet/culvert protections - Pavement and restoration: 700 SqYd of 8" concrete approach pavement, 25 SqYd of 8" concrete valley gutter, 50 SqYd of 4" asphalt repair, 2,400 SqYd of mulching, 0.5 acre of seeding/fertilizing, 160 Ft of high flow silt fence - Water service utilities: 350 Ft directional bore for 2" water service, 450 Ft of 2" water service, 1 each 6" x 2" saddle with corporation stop, 1 each 2" curb stop with box, 1 connection to existing water main - Notable Requirements: - Compliance with federal labor laws, affirmative action, and Buy American provisions - Strict adherence to FAA and airport safety, phasing, and wildlife management protocols - Coordination with airport management and FAA Tech Ops regarding impacts to navigational aids - Bid and performance bonding required - No specific OEMs or vendors are named; the building is to be pre-engineered steel, allowing for multiple potential manufacturers - Plans and specifications are available for purchase or download; sealed bid submission is required

Description

This solicitation is for the construction of a Snow Removal Equipment (SRE) Building at the Brookings Regional Airport in South Dakota. The project includes furnishing all equipment, labor, and materials for site work, water service utility, building construction, and domestic water plumbing. The work involves mobilization, excavation, concrete pavement, utility installation, and building construction of a 37'-8" x 63'-8" SRE building, along with site restoration and related construction activities. Bidders must comply with bonding requirements and submit sealed bids by the specified deadline.

View original listing