Posted
June 24, 2026
Respond By
July 15, 2026
Identifier
3012639-02 Addendum 1
NAICS
237310, 237110, 237990
The City of Cedar Rapids Public Works Department is seeking bids for the 3rd Street SE Pavement Rehabilitation project, a comprehensive street improvement initiative. - Government Buyer: - City of Cedar Rapids Public Works Department (Engineering office) - Project Scope: - Full pavement rehabilitation of 3rd Street SE from 8th Avenue to 5th Avenue - Major work includes: - Asphalt milling (5,296.4 SY HMA, 109 SY PCC) - Curb and gutter replacement (949.3 LF, 2.5' wide, 9" thick apron) - Storm sewer installation and removal (154 LF RCP, 24 LF VCP) - Water main and valve work (1 gate valve, 10 valve box adjustments, 1 fire hydrant assembly, 1 fire hydrant adjustment) - Manhole and intake installations/removals/adjustments (multiple types, e.g., 3 manholes, 10 intakes) - Sidewalk and driveway removals and replacements (354.7 SY sidewalk removal, 108.7 SY 5" PCC, 177.7 SY 6" PCC, 258.7 SY 7" PCC driveway) - ADA curb ramps and detectable warnings (205.2 SF) - Asphalt overlays (462.9 TON intermediate, 467 TON surface, PG58-28H) - Decorative pavers and paver base (22.4 SY each) - Pavement markings (multiple types: durable, MMA, thermoplastic, bike lanes, symbols, legends, grooves) - Temporary traffic control, signage, sod, erosion control (filter socks, inlet protection), and construction survey - Products/Services Requested (with part numbers and quantities): - Over 60 distinct line items, including: - Topsoil (126.1 CY, 2010-D-3) - Excavation (197 CY, 2010-E) - Subbase (474.8 SY, 2010-J) - Storm sewer (154 LF, 4020-A-1) - Gate valve (1 EA, 5920-A) - Fire hydrant assembly (1 EA, 5920-E) - Asphalt overlays (462.9 TON intermediate, 467 TON surface, 7021-A) - Sidewalks, driveways, curb/gutter, pavement markings, signage, sod, and more - Services: compaction testing (2010-M), HMA pavement samples/testing (7020-I) - Unique/Notable Requirements: - Compliance with SUDAS and Cedar Rapids General Supplemental Specifications - Incentive/disincentive payments for early/late completion (up to $15,000 incentive) - Coordination with city events and property owner notifications - Strict ADA compliance for curb ramps and sidewalks - Bid bond and bidder status form required; project is tax-exempt - All materials and equipment must meet city and SUDAS standards; no specific OEMs required - Estimated contract value: $590,000 (engineer's estimate) - No OEMs specified; materials must conform to city and SUDAS standards
Description
This solicitation is for a public improvement project involving asphalt milling, curb and gutter replacement, storm sewer intake relocations, manhole adjustments, water main replacement, fire hydrant assembly relocation, water valve replacement, valve adjustments, ADA curb ramps, asphalt overlay, and associated work. The project is located at 3rd Street SE from 8th Avenue to 5th Avenue in Cedar Rapids, Iowa. The engineer's opinion of probable cost is $590,000. The contract requires completion by October 30, 2026, with a late start date of September 8, 2026.