Opportunity
Delano #2026_WTR_002
City of Delano 1st Avenue Water Line Replacement Project – Pipe, Valves, Hydrants, and Jack & Bore Crossing
Posted
July 09, 2026
Respond By
August 06, 2026
Identifier
2026_WTR_002
NAICS
237110, 237990
The City of Delano, California is seeking bids for the 1st Avenue Water Line Replacement Project, a major public works initiative to upgrade water infrastructure along 1st Avenue. - Government Buyer: - City of Delano, City Clerk's Office - Scope of Work: - Replacement and installation of water lines, including: - 148 LF of 12" C900 DR18 PVC pipe - 689 LF of 12" restrained joint ductile iron pipe - 580 LF of 24" steel casing with 12" ductile iron carrier pipe (jack and bore under Highway 99) - 55 LF of 8" C900 DR18 PVC pipe - 90 LF of 6" C900 DR18 PVC pipe - 3 LF of 4" C900 DR18 PVC pipe - Multiple gate valve assemblies (12", 10", 8", 6") - 2 fire hydrant assemblies (AVK No. 2470 and No. 2490) - 1 pressure reducing station (Cla-Val Model 50-01) - 2 water service line replacements (2" IPS SP 160 PE Tubing) - Pavement sawcutting, aggregate base, and asphalt pavement repair - Connections to existing water system, abandonment/removal of old system, pressure testing, and disinfection - Notable Requirements: - Jack and bore cased crossing beneath Highway 99 - Compliance with California State prevailing wage laws - Valid Class “A” General Engineering Contractor’s License required - Performance and payment bonds, proposal guarantees, and insurance certificates - All contractors and subcontractors must hold valid City Business Licenses - OEMs and Vendors: - Cla-Val (pressure reducing valve) - AVK (fire hydrants) - Estimated Contract Value: - $1,700,000 to $2,000,000 - Project Duration: - Substantial completion required within 120 calendar days after Notice to Proceed - One-year guarantee period post-acceptance
Description
The project involves replacing an existing water line on 1st Avenue, including a jack and bore cased crossing beneath Highway 99. The work includes installation of 12-inch PVC and restrained joint Ductile Iron pipe, isolation valves, fire hydrants, water service lines, a pressure reducing station, and connections to the existing system as detailed in the project plans and specifications. The contract requires the contractor to have a Class "A" General Engineering Contractor's License and to comply with State prevailing wage laws. The project is managed by the City of Delano and bids are to be submitted to the City Clerk at City Hall.