Opportunity

SAM #W50S6K-26-Q-A001

Eielson AFB Command Suite and Conference Room Window Replacement

Buyer

USPF Activity AKANG 168

Posted

July 09, 2026

Respond By

August 10, 2026

Identifier

W50S6K-26-Q-A001

NAICS

236220, 238150

This opportunity involves the replacement and upgrade of windows and screens in the third floor command suite and conference room of Building 3127 at Eielson Air Force Base, Alaska, managed by the Department of the Air Force, 168th Civil Engineer Squadron (168 CES) and 168th Wing (PACAF). - Government Buyer: - Department of the Air Force - 168th Civil Engineer Squadron (168 CES) - 168th Wing (PACAF), Headquarters 168th Wing, Eielson Air Force Base - Products/Services Requested: - Replacement of four conference room windows (base bid) and ten command suite windows (option) - New windows must be triple pane, fiberglass casement, with a minimum Sound Transmission Classification (STC) of 40 - Windows must include reflective window film matching the south side of the building - Removal and reinstallation of existing blinds - Painting to match existing colors - All hardware and locking components included - Unique/Notable Requirements: - Color samples for window frames must be submitted for government approval - Windows must match the opening/closing functions of existing units - Contractor must provide all labor, materials, and equipment, and comply with safety, waste management, and security requirements - Option to replace additional command suite windows (rooms 320, 322, 323, 324, 325, 326, 328, 329) - No specific OEMs or part numbers are specified; the requirement is performance-based - 100% Small Business Set-Aside under NAICS 236220 - Period of performance is 35 days from contract award, with possible extension for material lead times

Description

168 CES requests the replacement/upgrade of the existing windows and screens inside Bldg. 3127, third floor command suite and conference room. Replacement windows shall have a minimum Sound Transmission Classification (STC) of 40. The new replacement windows shall be triple pane glass with a thickness of 1-3/4”. The new windows casement/frame shall be fiberglass, and the color selections shall be submitted to 168 CES for final approval prior to purchasing. The new windows shall have the same opening and closing functions/operations as the existing windows. The existing blinds shall be removed during demolition and reinstalled after the new windows have been installed. Paint used shall match any existing interior/exterior colors in the areas of disturbance by window replacement, as needed. The new exterior windows shall have proper reflective window film to match existing windows on the south side of the bldg. 3127. Please see the Statement of Work (SOW) for the full requirement description.

View original listing