Opportunity
New York State Contract Reporter #2136984
Troy Community Land Bank: High-Efficiency Boiler and Fire Sprinkler System Installation for Residential Building
Posted
July 09, 2026
Respond By
July 30, 2026
Identifier
2136984
NAICS
238220, 238210
This opportunity involves the supply and installation of new heating and fire safety systems for a residential building in Troy, NY. - Government Buyer: - Troy Community Land Bank Corporation (Management Division) - Project Scope: - Supply and install three high-efficiency natural gas boiler systems (70,000 BTU, minimum 95% AFUE) for three residential units - Includes removal and disposal of existing boilers - All associated piping, valves, controls, and venting systems - Circulator pumps, expansion tanks, pressure relief valves, backflow preventers, and other required components - Full compliance with codes, permits, inspections, and warranty requirements - Design, permit, furnish, and install a complete automatic fire sprinkler system compliant with NFPA 13 or 13R - Includes site visit, hydraulic calculations, stamped construction documents, installation, inspections, hydrostatic testing, and as-built drawings - Unique/Notable Requirements: - All work must comply with industry standards and local codes - Project includes both HVAC and fire protection system design-build - Minority and Women Business Enterprise (MWBE) participation goals: 20% MBE, 10% WBE - Full project documentation, cleanup, and warranty required - No specific OEMs or vendors are named; bidders may propose equivalent high-efficiency boiler and sprinkler system products
Description
The Troy Community Land Bank Corporation is soliciting bids for the supply and installation of three hot water base/boiler heating systems at 836 River Street in Troy, New York. The project involves installing new HVAC heating systems for three residential units in a 3-story brick building. The scope includes all labor, supervision, materials, tools, equipment, permits, and other necessary services to complete the work according to industry standards. The contract requires daily cleanup, full-time onsite supervision, and adherence to project specifications with progress meetings as needed. The project must be completed and invoiced prior to November 15, 2027, with proposals due by July 30, 2026.