Opportunity
SAM #FA489726QA5214
Temporary Fabric Aircraft Hangar Lease and Installation for Mountain Home AFB
Buyer
366th LRS
Posted
July 09, 2026
Respond By
July 31, 2026
Identifier
FA489726QA5214
NAICS
532310, 532490
This opportunity is a market research request from the 366th Contracting Squadron (366 CONS PKP) at Mountain Home Air Force Base, under the Air Combat Command, Department of the Air Force. - The government seeks the lease, installation, and removal of temporary aircraft hangar systems. - Requirement covers hangar structures to house and protect approximately two F-15 aircraft. - The scope has been expanded to include an additional temporary hangar approximately 50 ft by 50 ft. - Full turnkey support is required: - Delivery and on-site installation/assembly - Complete disassembly and removal at the end of the lease - The operational period is anticipated to be two months. - No specific OEMs or vendors are named in the notice. - Vendors are asked to provide rough order of magnitude (ROM) cost estimates, broken down by: - Mobilization - Delivery - Installation - Monthly lease/rental rate - Disassembly/removal - Notable requirements: - Hangar structures must meet specified dimensions and timeline constraints - Ability to house F-15 aircraft and provide an additional 50 ft x 50 ft hangar - Turnkey service for all phases of the lease
Description
Mountain Home Air Force Base (MHAFB) is currently in the planning phase for a short-term operational requirement. The Contracting Office is conducting market research to identify capable sources and obtain Rough Order of Magnitude (ROM) cost estimates for the lease, installation, and removal of temporary aircraft hangar systems.
The government requires temporary hangar structures capable of housing and protecting roughly two (2) F-15 aircrafts and an additional temporary hanger roughly 50 ft by 50 ft . Key parameters include:
Duration: A two (2) month operational period.
Services Required: Full turnkey support, to include delivery, on-site installation/assembly, and complete disassembly/removal upon lease expiration. Estimated Timeline: Performance is anticipated to begin on or about September 2027.
Estimated Cost (ROM): A rough, non-binding cost estimate broken down by:
Mobilization, delivery, and installation. Monthly lease/rental rate (for the 2-month duration). Disassembly, removal, and demobilization.
Please confirm your capability to deliver, install, and remove structures matching these dimensions and timeline constraints.