Opportunity

Costa Mesa Planet bids #25-15

Costa Mesa Fire Station No. 2 Reconstruction: Demolition, Temporary Quarters, and New LEED Gold Facility

Posted

July 08, 2026

Respond By

August 26, 2026

Identifier

25-15

NAICS

236220, 238190, 237110

This opportunity involves the complete reconstruction of Fire Station No. 2 in Costa Mesa, CA. - Government Buyer: - City of Costa Mesa Public Services, with involvement from the Division of Building Safety and Engineering Division - Project Scope: - Demolition of the existing 6,800 sq. ft. fire station - Provision and installation of fully operational temporary living and operating quarters for fire station staff - Construction of a new, single-story, 9,445 sq. ft. LEED Gold certified fire station, including residential, office, and equipment storage spaces - Site improvements, parking, and installation of a Modular Wetlands System (MWS) for stormwater treatment - Products and OEMs: - Modular Wetlands System (MWS), part number MWS-L-8-8-V, for stormwater management - Referenced products include RedBuilt engineered wood products and Hilti anchoring systems (OEMs highlighted) - Notable Requirements: - Structural design includes dimensional lumber, engineered I-joists, wood and steel beams, steel girders, plywood sheathed wood diaphragms, and ordinary moment frames - Foundations to be shallow continuous and pad footings with concrete slabs-on-grade, per geotechnical recommendations - Project must meet California Building Code and LEED Gold standards - Strict electronic bid submission via PlanetBids and physical bid bond required - Liquidated damages set at $4,400 per day for late completion - Class B (General Building Contractor) license required - Attachments provide detailed geotechnical, water quality, and hydrology reports - Estimated project value is $15,500,000 - Project duration is 730 calendar days

Description

This solicitation is for the reconstruction of Fire Station No. 2, City Project No. 25-15, located at 77 Fair Drive, Costa Mesa, CA. The scope includes demolition of the existing station, installation of a fully operational temporary living and operating quarters, and construction of a new LEED Gold certified fire station. The project requires a Class B General Building Contractor license and has an estimated value of $15,500,000. The project duration is within 730 calendar days, with liquidated damages set at $4,400 per day. A pre-bid meeting is scheduled for July 23, 2026, at 10:00 AM, and all bid responses must be submitted electronically by August 26, 2026, at 2:00 PM.

View original listing