Opportunity
SAM #N0038326QPB81
Navy Solicitation for Repair of General Assembly Component (PN EU00101-03-04)
Buyer
NAVSUP WEAPON SYSTEMS SUPPORT
Posted
July 09, 2026
Respond By
August 10, 2026
Identifier
N0038326QPB81
NAICS
336419, 332710, 336399
This opportunity involves the repair of a specialized General Assembly component for the Department of the Navy: - Government Buyer: - Department of Defense, Department of the Navy, NAVSUP Weapon Systems Support Philadelphia - Product/Service Requested: - Repair of General Assembly, Part Number EU00101-03-04, NSN 4920-016882872 - Quantity: 1 unit - Service includes inspection, component repair/replacement, reassembly, and testing to Ready For Issue (RFI) condition - Unique/Notable Requirements: - Contractor must follow the latest technical publications and approved written procedures; no deviations without Basic Design Engineer approval - Contractor must provide all facilities, labor, materials, parts, and test equipment - Quality management system must comply with ISO 9001/SAE AS9100; calibration system must meet ANSI/NCSL Z540.3 or equivalent - Government source approval required prior to award; proposals must include all data per NAVSUP WSS Source Approval Brochure - No government-furnished property will be provided - Strict requirements for process control documentation, configuration management, and storage of items - OEMs and Vendors: - No specific OEMs or commercial vendors are named in the solicitation; only government offices are referenced
Description
CONTACT INFORMATION 4 N762.34 UY2 771-229-0399 christopher.campellone.civ@us.navy.mil ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT 8 x WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16Invoice and receiving report combo typeN/ATBDN00383TBDTBDSee ScheduleTBD NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) 6 12 Months 60 days after discovery of defect EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026) 4 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) 11 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 5 BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 ROYALTY INFORMATION (APR 1984) 1 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008) 2 x Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor’s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 119 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of 0 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. This solicitation is for the repair of: GENERAL ASSEMBLY NIIN: 016882872 PN: EU00101-03-04 QUANTITY: (1) EA Please submit proposal via email to christopher.campellone.civ@us.navy.mil by the due date specified on page 1, block 10. If a firm fixed price (FFP) cannot be determined, please inform the PCO. These items require government source approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained online at https://www.navsup.navy.mil/public/navsup/wss/business_opps/ under "COMMODITIES." Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation. Please note, if evaluation of a source approval request submitted hereunder cannot be processed in time and/or approval requirements preclude the ability to obtain subject items in time to meet government requirements, award of requirement may be continued based on fleet support needs. 1. Scope Articles to be furnished hereunder shall be repaired, tested, and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. Any item contracted for repair shall have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: GENERAL ASSEMBLY; 4920-016882872; NSN, ; EU00101-03-04; Part Number, shall be performed in accordance with: GENERAL ASSEMBLY; Latest Publication(s). There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed through the Local DCMA/ACO office for review and recommendations via Form 1998. 2. Applicable Documents Not applicable. 3. Requirements 3.1 General This Statement of Work (SOW) establishes the criteria for repair and testing/inspection of the subject item. It includes inspection, component repair and replacement, reassembly, and testing procedures required to return units back into a serviceable condition. 3.2 Definitions CONTRACTOR: Is defined as the successful offeror awarded a contract, order, or issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual), reassembled, and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). REPAIR: A repaired part is one which has been restored to a Ready for Issue (RFI) condition (by replacing or repairing those components found to be defective, broken, damaged, or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 Scope The items to be furnished hereunder shall be overhauled, upgraded, repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided, Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the following items to a Ready For Issue (RFI) condition: GENERAL ASSEMBLY; EU00101-03-04; P/N, ; 4920-016882872; NSN, ; Latest; Tech Publications RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to Manuals and Drawings Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR. Requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or repair facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals, drawing, specification, repair source, or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change. 3.5 Parts and Materials The contractor is responsible for supplying all parts and materials necessary to perform the required repairs unless parts or materials are specifically identified as Government Furnished Material (GFM). All parts and materials used shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements. Authorization to use other than new material requires written approval from the PCO. Cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval. 3.6 Source and Location of Repair Source The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. For example: GENERAL ASSEMBLY; AAI CORP D/B/A TEXTRON SYSTEMS; 124 INDUSTRY LANE, HUNT VALLEY, MD 21030-0126; Cage Code: 97384 Inspection will be accomplished on the contractor's equipment. 3.7 Contractor Quality Requirements Establish, implement, document, and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/SAE AS9100. The system shall be designed to promptly detect, correct, and prevent conditions that adversely affect quality. Maintain a calibration system that meets ANSI/NCSL Z540.3, ISO-10012-1, or an equivalent calibration program acceptable to the Government. 3.8 Configuration Management (CM) The contractor shall maintain a configuration management plan in accordance with NAVSUP WSS configuration management clause NAVICPIA18. 3.9 Markings Marking shall be as indicated in the contract when applicable. 3.10 Storage The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. Additional Links: See Solicitation N0038326QPB81