Opportunity
SAM #N4008526R9059
Fire Exhaust System Upgrades and Repairs at Camp Lejeune and MCAS New River
Buyer
Naval Facilities Engineering Systems Command Mid-Atlantic
Posted
July 06, 2026
Respond By
August 05, 2026
Identifier
N4008526R9059
NAICS
236220, 238290, 238220, 238210
This opportunity involves upgrades and repairs to fire exhaust systems across multiple buildings at U.S. Marine Corps Base Camp Lejeune and Marine Corps Air Station New River in North Carolina. - Government Buyer: - U.S. Marine Corps, Marine Corps Base Camp Lejeune, Public Works Division - Scope of Work: - Upgrades and repairs to vehicle fire exhaust systems at several fire stations (Camp Johnson, Rifle Range, Camp Geiger, Air Station, Sandy Run, French Creek) - Conversion of existing pneumatic exhaust drops to magnetic drops - Installation of magnetic grabbers (various sizes), balancer locking cables, metal elbow hose saddles, safety disconnect handles, and kits compatible with F-Series ambulances - Installation of vehicle exhaust system rails, galvanized ductwork, 3-phase motor blowers, wall penetrations, UL-listed control panels, and VFDs with duct sensors - Design, installation, testing, and commissioning of HVAC controls and instrumentation (BACnet DDC systems, sensors, actuators, valves, VFDs) - Fabrication and installation of structural steel door frames, cover plates, expansion joint covers, floor gratings, bollards, wheel guards, and window/door guards - Firestopping systems and joint sealants meeting UL and ASTM standards - OEMs and Vendors: - No specific OEMs or vendors are named in the documents; however, the mention of "Plymovent system" suggests Plymovent as a likely OEM for some exhaust components - Products/Services Requested: - Magnetic grabbers with conical adapters (various sizes and quantities) - Kits compatible with F-Series ambulances - Balancer locking cables, metal elbow hose saddles, safety disconnect handles - Vehicle exhaust system rails with drops and accessories - Galvanized ductwork, 3-phase vehicle exhaust motor blowers, wall penetrations, UL-listed control panels, VFDs with duct sensors - Structural steel and metal fabrications, firestopping materials, joint sealants, HVAC controls and instrumentation - Unique/Notable Requirements: - Compliance with UL listing, ASTM, AWS, ASHRAE, NFPA, and BACnet standards - Coordination with fire station chiefs for installation - Emphasis on safety, environmental controls, and quality control plans - All work must meet EM 385-1-1 safety standards and indoor air quality certifications - Extensive submittal and inspection procedures required
Description
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.