Opportunity
SAM #N0010426QSD27
Repair and Modification Services for Power Supply Units for NAVSUP WSS Mechanicsburg
Buyer
NAVSUP Weapon Systems Support (WSS) Mechanicsburg
Posted
July 06, 2026
Respond By
August 03, 2026
Identifier
N0010426QSD27
NAICS
335931, 811210, 811219
NAVSUP Weapon Systems Support Mechanicsburg is seeking repair and modification services for specific power supply units used in naval systems. - Government Buyer: - Naval Supply Systems Command (NAVSUP) Weapon Systems Support Mechanicsburg - OEMs and Vendors: - Original manufacturers identified by CAGE codes: - CAGE 13058 (OEM not named) - CAGE 82877 (OEM not named) - Only authorized distributors of the original manufacturer are eligible; proof of authorization is required - Products/Services Requested: - Repair and modification of power supply unit, reference number 230088-1 (CAGE 13058) - Repair and modification of power supply unit, reference number 034718 (CAGE 82877) - Services include inspection, testing, and compliance with original manufacturer specifications - Unique/Notable Requirements: - 90-day Repair Turnaround Time (RTAT) from asset receipt - Government Source Inspection (GSI) is mandatory - Option for increased quantity included in the solicitation - All freight is FOB Origin - No new supply is being procured; this is strictly for repair and modification services
Description
CONTACT INFORMATION 4 N7M3.5 EPH 771-229-0387 WILLIAM.G.BIGGS4.CIV@US.NAVY.MIL ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996) 2 INSPECTION AND ACCEPTANCE OF SUPPLIES 26 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16 COMBO N/A TO BE DETERMINED (TBD) N00104 TBD TBD SEE SCHEDULE TBD TBD NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 WSS MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 WILLIAM.G.BIGGS4.CIV@US.NAVY.MIL BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) 11 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026) 2 OPTION FOR INCREASED QUANTITY (MAR 1989) 1 365 days ARO CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015) 1 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 5 BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENERGY PROGRAM USE (APRIL 2008) 2 X Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 90 days. Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:_______ Total Price:____ Repair Turnaround Time (RTAT): ____ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints: ______________________________________________________________ ___________________________________________________________ _____________________________________________________________ Repair Turnaround Time (RTAT): the contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date in the Commercial Asset Visibility (CAV) system. The contractor must report all transactions by the end of the fifth business day after receipt, and the Action Date in CAV must reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government within the RTATs established in this contract. Check one: Firm-fixed-Price __ Estimated ___ Not-to Exceed (NTE): Return Material Authorization # (RMA), if applicable:____ Delivery Vehicle (if Delivery Order requested):____________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $_____. The T&E fee (if asset is determined BR/BER) was determined based on:________________________________. AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: ____ Inspection & Acceptance CAGE, if not same as "awardee CAGE": ____ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":____ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:____ New unit delivery lead-time:____ The Government may add an option quantity to the contract. The Government can increase the quantity at the specified unit price. The Contracting Officer may exercise the option by written notice within the FAR 52.217-6 period. Delivery of added items shall continue at the same rate unless otherwise agreed. IMPORTANT NOTE: Any asset for which the contractor does not meet the RTAT will incur a price reduction per unit/month late. Excusable delays (e.g., Government Delay) will not result in a reduction. The Contracting Officer will implement reductions via a "reconciliation modification" at the end of the contract. Price reductions shall not limit other remedies, including termination for default. The contractor provides the following price reduction amount per unit per month for RTAT non-compliance: $____, up to a maximum of: $______. 1. SCOPE 1.1 This contract contains requirements for repair and quality standards for the POWER SUPPLY. 2. APPLICABLE DOCUMENTS 2.1 The listed documents form part of this contract, including modifications. Obtain the documents as specified. 3. REQUIREMENTS 3.1 The POWER SUPPLY shall meet operational and functional requirements as per the Cage Code(s) and reference numbers listed. All repair work shall follow the contractor's standards and approved documents. CAGERef. No. 13058230088-1 82877034718 3.2 Marking shall comply with MIL-STD-130, REV N, 16 NOV 2012. 3.3 Changes in design, material, or part number require notification and approval from NAVICP-MECH, with detailed documentation and coding as specified. 4. QUALITY ASSURANCE 4.1 Responsibility for inspection lies with the contractor, who may use suitable facilities. The Government reserves the right to inspect. 4.2 All items must meet contract requirements. Inspection records shall be kept for 365 days after final delivery. 4.3 The contractor shall perform inspection and testing as per original specifications. 5. PACKAGING 5.1 Preservation, packaging, packing, and marking shall follow the schedule and MIL-STD 2073. 6. NOTES 6.1 Obtain documents from the DODSSP website or other specified sources. Requests for official or classified documents must follow proper procedures. 6.2 Distribution statements are required for documents, with codes from A to X indicating distribution limits. 6.3 Only authorized distributors of the original manufacturer shall be considered for award. Proof of authorization must be provided. Additional Links: See Solicitation N0010426QSD27