Opportunity

CanadaBuys #7721

Drainage Rehabilitation of Kronsgart Drain – Phase 2, Stage 1

Posted

July 02, 2026

Respond By

July 16, 2026

Identifier

7721

NAICS

237110, 237990

Manitoba Transportation and Infrastructure is seeking bids for the rehabilitation of the Kronsgart Drain, Phase 2, Stage 1. - Government Buyer: - Manitoba Transportation and Infrastructure, Tendering and Contracts - Scope of Work: - Approximately 3.2 km of drain excavation (about 72,000 cubic meters) - Construction of berm and spoil pile - Installation of Group “A” (165 meters) and Group “B” (267 meters) culverts - Construction of a rock rip rap drop structure - Armouring of channel at bridge crossings with 350mm (1,400 metric tons) and 450mm (1,000 metric tons) stone riprap - Mobilization of equipment and traffic control (Level II) - Surveying, silt curtain installation, and cofferdam construction - Demolition and removal of existing structures - Removal of 250 meters of metal pipe culverts - Supply and installation of culvert gravel (675 metric tons), flap gates (17), markers (36), geotextile non-woven (2,200 sq m), straw wattle (90 meters), seeding (18 hectares), and straw mulch (18 hectares) - Provision of heavy equipment: hydraulic excavator (30 hours), crawler tractor and dozer (30 hours), tandem axle dump truck (30 hours) - Products/Services Requested: - No specific OEMs or vendors are named; all items are generic construction materials and services - Unique/Notable Requirements: - Large-scale earthworks and water management - Environmental controls (silt curtain, straw wattle, seeding, mulch) - Multiple specialized construction services and equipment - Competitive, open bidding process

Description

This solicitation is for the drainage rehabilitation of the Kronsgart Drain, involving approximately 3.2 km of drain excavation. The work includes construction of a berm and spoil pile, installation of Group "A" and "B" culverts, construction of a rock rip rap drop structure, and armouring the channel at existing bridge crossings with riprap. The project area extends from the east side of PR 332 in NW 4-4-1W westerly to NW 6-4-1W in the Municipality of Morris. The contract duration is estimated to be zero months with a proposed start date of August 13, 2026.

View original listing