Opportunity
South Dakota Posting Board #26IFB19870
Sturgis Armory HVAC Replacement and New Latrines Construction
Posted
July 02, 2026
Respond By
July 16, 2026
Identifier
26IFB19870
NAICS
236220, 238220, 238210
This opportunity involves a construction and HVAC upgrade project at the Sturgis Armory for the South Dakota Department of the Military. - Government Buyer: - State of South Dakota, Department of the Military - South Dakota Army National Guard, Construction & Facility Management Office - OEMs and Vendors: - Daikin (rooftop HVAC unit) - Loren Cook Company (exhaust fan) - Elkay (sink fixtures) - Olsonite (toilet seats) - Sloan (flush valves) - Symmons (faucets) - Powers (mixing valves) - Products and Equipment Requested: - Daikin rooftop HVAC unit (Model DSG0723WH00223C), quantity: 1 - Loren Cook Company roof exhaust fan (Model 100 ACEH), quantity: 1 - Elkay single compartment sink (LUSTERTONE), with LK-3000CR supply fitting and LK99 grid drain - Olsonite #95 toilet seat, American AFWALL water closet, Sloan Regal 111-1.2 XL flush valve - Symmons S-20-2-G lavatory faucet, Powers LFG480 thermostatic mixing valve - Structural steel system, rough carpentry, architectural wood casework, firestopping, joint sealants, steel doors and frames, door hardware, interior finishes, gypsum board assemblies, tiling, toilet accessories, countertops - Services Requested: - Demolition and removal of existing HVAC and kitchen area - Construction of new unisex bathroom and lactation room - Installation of new HVAC system and associated ductwork - Mechanical, electrical, plumbing, and structural work - Unique/Notable Requirements: - Compliance with Build America, Buy America provisions - Minimum 80% recycled content for structural steel - ADA compliance for fixtures and hardware - Coordination among trades and adherence to safety, environmental, and quality standards - Liquidated damages for delays - No specific contract vehicle or administrative requirements highlighted.
Description
This solicitation is for the replacement of the air handling unit at the Sturgis Armory and the construction of new bathroom facilities. The existing air handling unit, located above the ceiling in the area of the proposed new bathroom, will be demolished and removed. A new roof-mounted air handling unit will be installed, with ductwork adapted accordingly before bathroom and lactation room construction. The project also includes demolishing the existing kitchen to construct a unisex bathroom and a lactation room.