Opportunity
Salem-Keizer School District 24J Ionwave #2026-1102 Addendum 1
Stage Rigging and Lighting System Replacement at McNary High School
Posted
June 17, 2026
Respond By
July 07, 2026
Identifier
2026-1102 Addendum 1
NAICS
238210, 238290
The Salem-Keizer School District 24J is seeking bids for the comprehensive replacement of stage rigging and related systems at McNary High School in Keizer, Oregon. - Government Buyer: Salem-Keizer School District 24J - Project Scope: - Demolition and disposal of existing manual counterweight rigging line sets, drapery tracks, stage draperies, and t-bar battery elements (fire curtain system to remain) - Installation of new counterweight rigging line sets with motor assist units, J-bar wall and guard assembly, and flown acoustic reflector units with integrated downlights - Electrical upgrades including new 120/208V motor power panel board, lighting dimmer cabinet modifications, new low voltage wiring for lighting controls and DMX/RDM systems - Installation of new LED retrofit engines (notably, CANTO USA 'RETROFUSION 2.0 LED RETROFIT ENGINE'), lighting network receptacles, control stations, DMX output receptacles, plug boxes, and index rail lights - Protection and re-use of existing electrical components and stage equipment where possible - All necessary electrical engineering, permitting, and compliance with safety and prevailing wage requirements - OEMs Highlighted: - CANTO USA (for LED retrofit engine) - Notable Requirements: - Mandatory pre-bid site walk - Bid security, performance and payment bonds - Lead and asbestos safety protocols - Strict student safety and access controls - Encouragement of participation from minority-owned, women-owned, and emerging small businesses - No other specific OEMs or product part numbers are mentioned beyond CANTO USA.
Description
This solicitation is for the replacement of stage rigging at McNary High School located at 595 Chemawa Rd N, Keizer, OR. The work includes demolition and disposal of existing counterweight rigging line sets, drapery tracks, stage draperies, and t-bar battery elements, followed by installation of new rigging equipment, acoustic reflectors, and electrical equipment as per plans and specifications. The project requires compliance with safety, bonding, insurance, and non-discrimination requirements. A mandatory pre-bid and site walk is scheduled for June 25, 2026, at 10:00 AM at the school site.