Opportunity
SAM #1240LT26Q0120
Silver Lake Restroom Roof Replacement – USDA Forest Service Construction Solicitation
Buyer
Unita-Wasatch-Cache National Forest
Posted
July 02, 2026
Respond By
July 29, 2026
Identifier
1240LT26Q0120
NAICS
238160, 238130, 238190
This opportunity from the USDA Forest Service seeks construction services for the Silver Lake Restroom Roof Replacement in the Uinta-Wasatch-Cache National Forest. - Government Buyer: - USDA Forest Service, Intermountain Region, Salt Lake Ranger District - Uinta-Wasatch-Cache National Forest, Salt Lake Ranger District - Scope of Work: - Remove and replace timber-framed roof damaged in winter 2023 - Demolition of existing roof structure - Protection and salvage of existing amenities and ceiling-mounted electrical components - Framing new roof members and reinstalling interior finishes - Installation of new metal roofing, painting, and staining to match existing finishes - Products and Materials Requested: - Douglas Fir lumber (No. 2 grade, PS 20, WWPA standards) - Structural Insulated Panels (SIPs) by Insulspan Incorporated or approved equal - Solid-sawn wood decking (Cedar, 2x6 T&G, AITC112 standard) - Structural glued laminated units (Glulam, ANSI/AITC A190.1) - Finish carpentry lumber (Grade B redwood or western red cedar) - Plastic paneling (Marlite Plank Module or approved equal) - Formed metal roof panels (MBCI 5V Crimp Panel or approved equal, zinc-coated steel) - Paint and coatings (Sherwin-Williams or approved equal) - Staining and transparent finishing (solvent-based stains and fillers) - Notable Requirements: - Compliance with ASTM, ANSI, ICC, and AITC standards - 20-year warranty for SIPs - Snow cleat system for metal roof panels - Quality assurance and detailed submittal procedures - No specific part numbers or quantities for most materials; all technical details referenced in attachments - Set aside for small business participants - Performance required within 120 calendar days after notice to proceed - Located in Salt Lake County, Utah
Description
This project consists of removing and replacing the Silver Lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.