Opportunity
PIEE #W912DY26RA071
Energy and Water Conservation Services for Fort Benning (UESC)
Buyer
USACE Engineering Support Center Huntsville
Posted
June 29, 2026
Respond By
July 29, 2026
Identifier
W912DY26RA071
NAICS
541690, 221310, 238210, 541330
This opportunity from the USA Engineering Support Center Huntsville seeks proposals for a Utility Energy Service Contract (UESC) at Fort Benning, Georgia. - Government Buyer: - Agency: USA Engineering Support Center Huntsville (W2V6) - Location: Fort Benning, Georgia - Scope of Work: - Energy and water conservation services to reduce consumption, utility costs, and maintenance, repair, and replacement (MRR) costs - Implementation of energy and water conservation measures (ECMs) - May include distributed generation, energy storage technologies, ongoing commissioning, and other modern infrastructure improvements - Services designed to enhance security, resilience, and mission assurance of energy and water systems - Products/Services Requested: - No specific OEMs, vendors, or part numbers are named in the notice - Focus is on comprehensive services and solutions rather than specific products - Unique Requirements: - Modernization of infrastructure to improve system resilience and mission assurance - All ECMs must be installed, operational, and accepted by the Procuring Contracting Officer before contract completion
Description
The purpose of this UESC is to acquire energy and water conservation services, reduce energy or water consumption and associated utility costs, and reduce energy and water- related maintenance, repair and replacement (MRR) costs, as specified in each associated contract or task order (Contract). UESCs are used to obtain energy and/or water cost and/or energy unit savings through the implementation of various energy and/or water conservation measures (ECMs). As part of and in addition to achieving energy savings, UESCs may enhance the security and the resilience of energy and water systems, modernize infrastructure, and improve mission assurance through technologies including but not limited to distributed generation and energy storage technologies, continual/ongoing commissioning, and other technologies. MRR savings must be related to the ECM, that is, costs reduced or avoided by the implementation of one or more ECMs. The implementation period is the period between the date of Contract award and the date that all ECMs are completely installed/implemented by the Contractor, operational, and accepted by the Procuring Contracting Officer (PCO).