Opportunity

SAM #140P8326R0006

ABAAS Accessibility Improvements and Restroom Foundation Construction at Fairholme Campground, Olympic National Park

Buyer

Pwr Olym Mabo

Posted

July 01, 2026

Respond By

July 15, 2026

Identifier

140P8326R0006

NAICS

238910, 238990, 237310, 238190, 237990

The National Park Service (NPS), Olympic National Park, is seeking contractors for accessibility and infrastructure improvements at Fairholme Campground in Clallam County, Washington. - Government Buyer: - Department of the Interior, National Park Service, Contracting Operations - West, Olympic National Park - Scope of Work: - Construction of 12'x12' foundations, floor slabs, retaining walls, aprons/sidewalks, stairs, ABAAS-compliant ramps, and handrails for comfort stations in Loop A and Loop B - Rough utility connections for restroom foundations - Creation or improvement of ABAAS-accessible trails connecting campsites 3, 4, 16, 45, and 69 - ABAAS improvements to these campsites - Removal, repair, and reinstallation of signboards at comfort stations - Option Items: - Construction of additional ABAAS crosswalks and trails connecting campsites to comfort station trails - Asphalt paving of parking areas for specified campsites - No specific OEMs, vendors, or part numbers are mentioned; the requirement is for construction and accessibility improvement services - Notable Requirements: - All work must comply with ABAAS (Architectural Barriers Act Accessibility Standards) for accessibility - Work includes both base and optional line items for expanded accessibility and site improvements

Description

The National Park Service (NPS) Olympic National Park (OLYM) in Clallam County, Washington, has a requirement to make ABAAS improvements and construct family restroom foundations at Fairholme Campground.1. The work of this contract consists of constructing:a.) 12'x12' foundation, floor slab, retaining wall, and apron/sidewalks for Loop A comfort station. Stairs, ABAAS ramp, and handrails on the Loop A comfort station.b.) 12'x12' foundation, floor slab, and comfort station apron/sidewalks for the Loop B Comfort Station.c.) Make necessary rough in utility connections for family restroom foundations.d.) New or improved ABAAS trails connecting sites 3,4,16,45,69 including crosswalk for site 16.e.) ABAAS improvements to campsites 3,4,16,45,69.f.) Remove, Repair, and Reinstall signboards at comfort station Loop A and Loop B.2. Option Items May include:a. Construct ABAAS crosswalk and trail connecting campsite 3 to Loop A comfort station trail. Asphalt pave parking areas for campsites 3 and 4.b. Construct ABAAS crosswalk and trail connecting campsite 69 to Loop B comfort station trail. Asphalt pave parking areas for campsites 45 and 69.

View original listing