Paulding County Board of Commissioners is requesting bids for the installation of a new mechanical wastewater bar screen at the Paulding County Jail. - Government Buyer: - Paulding County Board of Commissioners (Paulding County, GA) - Products and Equipment Requested: - Mechanical wastewater bar screen (to be installed in an 8-foot diameter precast concrete structure) - Compactor conveyor system - Two flow control slide gates - 94 linear feet of 10-inch SDR 26 PVC sewer line - One precast concrete manhole - Water service connections (1-inch PE and copper piping, meter, RPZ type backflow preventer, yard hydrant, valves, and appurtenances) - Services Required: - Earthwork and concrete paving - Electrical work - Erosion control measures - Temporary facilities and traffic control - Permanent grassing and site restoration - Unique or Notable Requirements: - Contractor must provide all materials and labor - Georgia State Contractor's License required - Bid bond, performance and payment bonds, and non-collusion affidavit required - No specific OEMs or vendors are named in the solicitation - All work must comply with project specifications and local regulations.

Description

Sealed bids are being solicited by the Paulding County Board of Commissioners for the installation of a new mechanical wastewater bar screen within an 8-foot diameter precast concrete structure. The project includes a compactor conveyor system, flow control slide gates, sewer line installation, precast concrete manhole, water service connections, piping, meter, backflow preventer, yard hydrant, valves, heat tracing and insulation of piping, earthwork, concrete paving, electrical work, erosion control, temporary facilities, wastewater flow control, traffic control, and permanent grassing. The contractor is responsible for furnishing all materials and performing all associated work as specified in the drawings and specifications.

View original listing