Opportunity

Dept of Management Services Florida #ITB 26-PW-03

Edgewater SUNTrail North Segment Construction: Shared-Use Path, Drainage, Lighting, and Signalization

Posted

June 10, 2026

Respond By

July 09, 2026

Identifier

ITB 26-PW-03

NAICS

237310, 237990, 238110

The City of Edgewater, Florida, is seeking bids from qualified contractors for the construction of the SUNTrail North Segment, a shared-use path project funded by the Florida Department of Transportation (FDOT). - Government Buyer: - City of Edgewater Purchasing Department, Public Works - Project coordinated with FDOT and funded through the State of Florida's SUN Trail Network Program - Products and Construction Scope: - Construction of a concrete shared-use path from S.R. 442 to Dale Street - Major work includes: - Concrete sidewalks and driveways (over 15,500 sq ft at 4" and 2,600 sq ft at 6" thickness) - Drainage improvements: multiple types and sizes of pipe culverts, inlets, manholes, and endwalls - Lighting: luminaires, bracket arms, conductors, and power service - Pedestrian and traffic signalization: LED countdown signals, hybrid beacons, rapid flashing beacons, traffic controller assembly, managed field Ethernet switch, uninterruptible power supply, remote power management unit - Signing and pavement marking: ground sign assemblies, internally illuminated and enhanced highway signs, thermoplastic markings, raised pavement markers - Fencing, gates, handrails, and turf restoration - Utility coordination and adjustments, including fire hydrant relocation and utility structure modifications - Notable Requirements: - Contractors must be FDOT pre-qualified - Compliance with FDOT Standard Specifications, Florida Greenbook, Volusia County right-of-way, and all environmental permits (including U.S. Army Corps of Engineers and St. Johns River Water Management District) - Adherence to contamination screening and geotechnical recommendations - No federal funds involved; federal wage and DBE requirements do not apply - Stanley Consultants, Inc. is the engineering firm for project plans - Estimated contract value: approximately $3.8 million - Project aims to enhance pedestrian and bicycle mobility, safety, and local connectivity

Description

The City of Edgewater is soliciting sealed bids from qualified and licensed contractors to provide all labor, materials, equipment, supervision, and incidentals necessary for construction of the SUNTrail North Segment from S.R. 442 to Dale Street, FPID 439862-3-54-01. The project is coordinated with the Florida Department of Transportation (FDOT) and must comply with FDOT specifications, plans, and local requirements. It includes construction of a concrete shared-use path, driveway improvements, drainage modifications, lighting, pedestrian signalization, signing and pavement marking improvements, utility coordination, restoration, and related work. The project aims to enhance pedestrian and bicycle mobility, improve safety, provide connectivity, and support economic development and recreation.

View original listing