Opportunity
Four Rivers Sanitation Authority Frsa #27-406
Comprehensive Maintenance Building Renovation with Specified HVAC and Mechanical Equipment
Posted
June 01, 2026
Respond By
July 21, 2026
Identifier
27-406
NAICS
238220, 238290
This opportunity involves a major renovation of the Four Rivers Sanitation Authority's Maintenance Building in Rockford, Illinois. - Government Buyer: - Four Rivers Sanitation Authority, Engineering Department - Project Scope: - Comprehensive architectural, mechanical, electrical, structural, and civil renovations - Demolition, replacement, and installation of HVAC, electrical, mechanical, and plumbing systems - Integration of new equipment with the Authority's Building Automation System (BAS) - Strict compliance with IBC, IEBC, IFC, ADA, NFPA, ASHRAE, OSHA, EPA, and local codes - Coordination with field conditions, permit acquisition, and certificate of occupancy required - Key OEMs and Equipment: - Trane: Furnaces (models S9X2D120, S9X2B060, S9X2C100), condensing units, energy recovery ventilator - Titan: Makeup air units (models TAH-115-FCID0800-OA-HRH, TAH-109-FCID0250-OA-HRH) - Reznor: Infrared heaters (model VZ-40) - Loren Cook: Exhaust fans (models APD-16-ECM, ACED-ECM-210, ACED-ECM-90) - Mitsubishi: Wall-mounted heat pump (model MSZ-FX12NL) - Ruskin: Stationary louver (model ELF375DX) - Titus: Air devices (various models) - Products and Quantities: - 5 Trane S9X2D120 furnaces - 2 Trane S9X2B060 furnaces - 4 Trane S9X2C100 furnaces - 1 Trane HE20IN-AA energy recovery ventilator - 1 Mitsubishi MSZ-FX12NL heat pump - 2 Titan makeup air units (1 each of TAH-115-FCID0800-OA-HRH and TAH-109-FCID0250-OA-HRH) - 2 Reznor VZ-40 infrared heaters - 5 Loren Cook exhaust fans (2 APD-16-ECM, 2 ACED-ECM-210, 1 ACED-ECM-90) - 1 Ruskin ELF375DX louver - Multiple Titus air devices and electrical panels - Civil work: concrete, curbs, gutters, storm sewers, bollards, and more - Notable Requirements: - All work must be coordinated with field conditions and comply with detailed plans and specifications - Integration with existing BAS controls - Contractor responsible for all permits and final certificate of occupancy - Collaboration with Blakemore Architects, CORE 4 Engineering, and Oxford Engineering, Ltd.
Description
This solicitation is for the renovation of a maintenance building under Capital Project No. 2102. The project involves architectural, mechanical, electrical, structural, and civil work as detailed in the provided plans and specifications. The contractor is required to coordinate all drawings with actual field conditions and obtain necessary permits and certificates of occupancy. The project is managed by the Engineering Department of Four Rivers Sanitation Authority in Rockford, Illinois.