Opportunity
Bettendorf Ionwave #2026-0015
Bettendorf Turnberry Lane & Thomas Court Concrete Reconstruction Solicitation
Posted
June 30, 2026
Respond By
July 14, 2026
Identifier
2026-0015
NAICS
237310, 237990
The City of Bettendorf, Iowa is seeking bids for the reconstruction of Turnberry Lane and Thomas Court, focusing on concrete pavement and related infrastructure improvements. - Government Buyer: - City of Bettendorf, Engineering Division of the Public Works Department - Project Scope: - Reconstruction of approximately 480 linear feet of 31-foot-wide roadway with 6-inch Portland Cement Concrete (PCC) pavement - Includes removal and replacement of driveway approaches, partial sidewalk reconstruction, storm sewer intake reconstruction and adjustments - Additional work: sodding, erosion control, traffic control, mailbox relocation, irrigation and invisible fencing system restoration - Products/Materials Requested: - Portland Cement Concrete (PCC) pavement, 6-inch (1,540 sq ft) - PCC driveway, 6-inch (79 sq ft) - PCC sidewalk, 4-inch (328 sq ft) - Granular subbase, 6-inch (1,570 units) - Granular stabilization material, subgrade treatment fabric, perforated flexible drain tile, temporary aggregate surfacing, topsoil, sodding, fertilizing, chemical spray, flexible growth medium - Stormwater management items: filter socks, intake protection devices, new and adjusted intakes, manhole adjustments - ADA compliance: detectable warning surfaces at curb ramps - Notable Requirements: - Strict compliance with city and SUDAS specifications - Coordination with multiple utility companies for utility adjustments - Adherence to Construction Site Erosion & Sediment Control Permit (COSESCO) and Storm Water Pollution Prevention Plan (SWPPP) - Performance and maintenance bond equal to 100% of contract price - Liquidated damages of $500 per day for late completion - No specific OEMs or proprietary products are named; standard construction materials and methods are specified.
Description
This Invitation to Bid is for the reconstruction of approximately 480 lineal feet of 31-foot wide existing concrete pavement with new 6-inch Portland Cement Concrete (PCC) pavement on a drainable subbase with subdrains on Turnberry Lane and Thomas Court. The project includes removal and replacement of driveway approaches, partial reconstruction of sidewalks, storm sewer intake reconstruction and adjustments, sodding, erosion control, traffic control, and other related work. Work must commence on or after July 22, 2026, and be completed within 60 calendar days or by October 15, 2026, whichever comes first. Liquidated damages of $500 per calendar day will be charged for delays past the completion date.