Opportunity

SAM #W911PT26QA073

Feed Water Piping Replacement at Watervliet Arsenal Building 136

Buyer

Watervliet Arsenal

Posted

June 30, 2026

Respond By

July 15, 2026

Identifier

W911PT26QA073

NAICS

238220, 237110

This procurement opportunity from the U.S. Army Contracting Command at Watervliet Arsenal seeks a contractor for the replacement of feed water piping at Building 136. - Government Buyer: - Department of the Army, Installation Management, Public Works Division, Facilities Engineering (TAWV-IMP-F) - U.S. Army Contracting Command, Watervliet Arsenal - OEMs and Vendors: - No specific OEMs or commercial vendors are named; backflow preventers are government-supplied - Products/Services Requested: - Removal and replacement of approximately 70 linear feet of 4-inch black carbon steel feed water piping and fittings - Replacement of two backflow preventers (government-supplied) - Installation of 30 linear feet of 3-inch schedule 40 PVC DWV lines and fittings - Replacement of 4-inch butterfly valve for holding tanks and 4-inch OS&Y isolation valve for water softeners - Installation of new pipe fittings, flanges, gaskets, bolts, unions, and insulation (closed cell, 1.5 inch thick, with vapor barrier and PVC jacketing) - Pipe labeling as required - Unique or Notable Requirements: - Radiographic examination of at least 10 field welds, with removal and re-welding of unacceptable welds at no additional cost - Hydrostatic leak testing of all applicable piping systems, witnessed and approved by the Contracting Officer’s Representative (COR) - Compliance with wage determinations and safety standards - Submittals required for safety plans, welding procedures, and radiographic test results - Project magnitude estimated between $25,000 and $100,000 - 100% payment and performance bonds required (performance bonds if quote exceeds $150,000) - Set aside for SBA - All work to be completed within 45 calendar days from notice to proceed, during normal duty hours, excluding federal holidays

Description

TO PROVIDE ALL LABOR, MATERIAL, PARTS AND EQUIPMENT REQUIRED FOR THE REMOVAL AND REPLACEMENT OF FEED WATER PIPING AT BUILDING 136 PER SOW PROJECT #26PW004 Bldg 136v2.

Wage Determination General Decision Number: NY2, latest revision applies and is incorporated.

Magnitude of this Project is between $25,000 and $100,000

Period of Performance is 45 Calendar Days from receipt of Notice to Proceed.

100% Payment and Performance Bonds (Performance bonds only if quote is over $150k) are required

Technical POC is Michael White.

Pricing Arrangement: Firm Fixed Price