Opportunity
SAM #1240LT26Q0001
USDA Forest Service Solicitation for Well Development and Utility Building at Bear River Administrative Site
Buyer
USDA Forest Service
Posted
June 29, 2026
Respond By
July 23, 2026
Identifier
1240LT26Q0001
NAICS
237110, 238220, 238210
This opportunity involves the USDA Forest Service seeking well development and supporting infrastructure at the Bear River Administrative Site in Utah. - Government Buyer: - USDA Forest Service (Department of Agriculture) - Scope of Work: - Well development, including installation of a submersible well pump and motor - Construction of a 10' x 12' precast concrete utility building - Installation of a variable frequency drive, pump accessories, and pressure tanks - Electrical distribution system setup - Installation of potable water pipelines (HDPE, 2" to 12" diameters, various lengths) - Pumpout drain, poly curb valves and boxes, and galvanized utility box - Pumphouse plumbing appurtenances - Option for additional hydrant, pipeline, and curb valve - Products/Services Requested: - Submersible well pump and motor (part number 221120) - Variable frequency drive (part number 221120) - Pressure tanks (part number 221103, quantity: 4) - Potable water pipelines (HDPE, 2"–12", part number 221100, total lengths: 425 ft (3"), 525 ft (4"), 400 ft (12"), 100 ft (2")) - Precast concrete utility building (10' x 12', part number 133400, quantity: 1) - Additional plumbing, electrical, and site development components - No specific OEMs or vendors are named in the solicitation or attachments - Unique/Notable Requirements: - All materials and installation must meet the technical specifications in the Statement of Work and drawings - Includes both base and optional bid items for expanded site capability
Description
The Bear River Administrative Site is located on the Evanston – Mountain View Ranger District of the Uinta – Wasatch – Cache National Forest, in Summit County, Utah, approximately 31 miles south of Evanston, WY. The Bear River Administrative Site is located on the East side of UT HWY 150 at approximately MM 46.4. The well, the new utility building and much of the distribution system are located in the NE quarter of Section 29, Township 2N, Range 10E, SL B&M. The well is located at (Latitude 40.88265N, Longitude -110.83050W) at an elevation of approximately 8,460 feet.