Opportunity
SAM #W519TC26QA162
Chilled Water Line Installation and Pavement Replacement at Rock Island Arsenal
Buyer
W6QK ACC-RI
Posted
June 29, 2026
Respond By
June 29, 2026
Identifier
W519TC26QA162
NAICS
237110, 237990, 238220
This opportunity involves a major infrastructure project at Rock Island Arsenal, managed by the US Army Garrison's Directorate of Public Works, Engineering and Services Division. - Government Buyer: - US Army Garrison, Rock Island Arsenal - Directorate of Public Works, Engineering and Services Division - Products and Services Requested: - Installation of two 10-inch dual wall preinsulated PVC chilled water pipes between buildings 108 and 114 - Disconnection and removal of existing chilled water lines - Trench excavation and backfill with granular and modified subbase materials - Removal and replacement of hot mix asphalt (HMA) and portland cement concrete (PCC) pavements in parking lots, streets, and sidewalks - Installation of new flowmeters in chilled water piping returns - Replacement of standard curb and gutter - Hydraulic seeding and topsoil restoration for disturbed green spaces - Compaction testing and (if needed) rock excavation services - Construction staking, environmental compliance, waste disposal, and safety/security training - OEMs and Vendors: - No specific OEMs or vendors are named; products are specified by material and type (e.g., preinsulated PVC pipe, flowmeters) - Unique or Notable Requirements: - Project must be completed within 150 working days after notice to proceed - Contractor must provide all labor, equipment, materials, and supervision - Environmental, safety, and security compliance is mandatory, including specific training for all personnel - Independent compaction testing is required - Liquidated damages apply for delays - Project is set aside 100% for small businesses
Description
This is a notice that a solicitation is anticipated to be forthcoming and will have all the necessary documents. Please see the attached Scope of Work (SOW) PR #2025-0316 for detailed project requirements.
The scope of this project consists of furnishing labor, equipment, and material to install two 10-inch dual wall preinsulated polyvinyl chloride (PVC) chilled water pipes from building 108 to building 114. The process of installing the new pipe will require the removal and replacement of the existing pavements in Parking Lot 131A, 2nd Street, Parking Lot 144, and South Avenue. The existing pavements are a combination of hot mix asphalt (HMA) and portland cement concrete (PCC). The project is located along South Avenue, starting inside building 114, transitioning outside of the building and tracking along Parking Lot 131A, crossing 2nd Street, traversing along Parking Lot 144, finally crossing South Avenue and ending inside building 108 on the Rock Island Arsenal, Rock Island, IL.
The performance and payment bonds are required and add that this is a 100% small business set aside.