Opportunity
New York State Contract Reporter #2243016
East Street Water Main Replacement – Pipe, Aggregate, and Construction Services Sought
Posted
June 29, 2026
Respond By
August 03, 2026
Identifier
2243016
NAICS
237110, 238990, 423320, 423390
This opportunity involves the replacement of the East Street water main in Fort Edward, NY, managed by the Washington County Industrial Development Agency (WWIDA). - Government Buyer: - Washington County Industrial Development Agency (WWIDA) - Project managed by Chuck Barton - Project Scope: - Replace approximately 1,700 linear feet of existing 8-inch cast iron water main with new 10-inch PVC water main - Install valves, fittings, hydrants, and service connections up to the curb stop - Connect to existing water mains and abandon the old main - Flush, test, and disinfect the new main - Restore pavement and subbase, including milling and overlay of East Street - Perform site restoration, utility protection, and prepare record drawings - Products/Services Requested: - 10-inch PVC water main (approx. 1,700 linear feet) - Valves, fittings, hydrants, and service connection materials - Aggregate and pipe supply - Asphalt paving/milling, concrete curb/sidewalk installation - Trucking and traffic control services - Site restoration and record drawing preparation - Unique/Notable Requirements: - All work must comply with Village of Fort Edward standards - Improvements will be dedicated to the Village upon completion - Prime contractor Wm. J. Keller & Sons Construction Corp. is seeking DBE/WBE subcontractors for key trades (asphalt, concrete, pipe, aggregate, trucking, traffic control) - No specific OEMs are named; suppliers for pipes and aggregates are sought
Description
This solicitation is for the replacement of approximately 1,700 linear feet of existing 8-inch cast iron water main with a 10-inch PVC water main along East Street in Fort Edward, NY. The work includes installation of valves, fittings, hydrants, service connections, connection to existing mains, abandonment of old mains, flushing, testing, and disinfection. Additional tasks involve pavement and subbase removal and replacement, surface restoration, milling and overlay of East Street, traffic maintenance, utility protection, coordination with utility companies, site restoration, and preparation of record drawings. All work must comply with contract documents and Village of Fort Edward standards, with improvements dedicated to the Village upon completion. The prime contractor is seeking DBE/WBE subcontractors for services such as asphalt paving/milling, concrete curb/sidewalk, pipe supply, aggregate supply, trucking, and traffic control.