Opportunity
SAM #19PE5026R0002_
Comprehensive Renovation and Maintenance at G8 INL Facilities, American Hangar, Lima, Peru
Buyer
U.S. Embassy Lima
Posted
June 26, 2026
Respond By
July 03, 2026
Identifier
19PE5026R0002_
NAICS
236220, 238190, 238210, 238220, 238320, 238290, 238350, 238310, 541330
This opportunity involves a comprehensive renovation and maintenance project at the G8 INL Facilities, American Hangar, FAP Base–Callao, Lima, Peru, managed by the U.S. Embassy Lima under the Department of State. - Government Buyer: - U.S. Embassy Lima, Department of State, INL Peru, Contracting Office - Scope of Work: - Full renovation of passenger restrooms (men's and women's), second-floor bathrooms, and hallway - Roofing replacement and waterproofing for VIP lounge and passenger hall - Maintenance and painting of metal structures, including exterior evacuation staircase and pedestrian walkway - Architectural finishes, woodwork, tile work, and baseboard installation - Electrical fixture replacement and upgrades - Site cleanup, equipment and supply provision, and logistics office improvements - Professional engineering supervision and certification by CIP-licensed Peruvian civil and electrical engineers - Preparation of sealed engineering design packages and closeout documentation (as-builts, test reports, O&M manuals, warranties) - Products/Materials: - Plumbing fixtures (e.g., Vainsa faucets), tiles, roofing materials, electrical components - Unique/Notable Requirements: - All engineering design and supervision must be performed by CIP-licensed Peruvian engineers - Compliance with both U.S. and Peruvian standards and regulations - One-year warranty on all work - No advance payments; progress payments by CLIN - Separate tracking of Peruvian VAT for compliance - No specific OEMs or product part numbers are mandated, but Vainsa is referenced for plumbing fixtures.
Description
Maintenance and Infrastructure Improvements at G8 INL Facilities – American Hangar, FAP Base–Callao, Lima, Peru This requirement encompasses comprehensive multi-trade renovation and maintenance work at the INL facilities within the American Hangar at Air Wing #2 (Group 8), FAP Base–Callao, including passenger restrooms, second-floor bathrooms, exterior evacuation staircase, passenger hall, VIP lounge, and logistics offices. Work includes demolition, plumbing, architectural finishes, woodwork, electrical installations, roofing, metal structure maintenance, and professional engineering supervision