Opportunity
City of Moline Ionwave #1501 Addendum 1
City of Moline Solicits Bids for Old Oakwood Subdivision Street Reconstruction
Posted
June 14, 2026
Respond By
June 30, 2026
Identifier
1501 Addendum 1
NAICS
237310, 237110, 237990
The City of Moline Engineering Department is seeking bids for the reconstruction of 27th Avenue A, 28th Avenue A, and 30th Street in the Old Oakwood Subdivision. - Government Buyer: - City of Moline Engineering Department (Rock Island County, Illinois) - Project Scope: - Full removal and replacement of Portland Cement Concrete (PCC) pavement (7" with integral curb) on three residential streets - Sidewalk and driveway replacement, including 4" and 6" PCC sidewalks and ramps - Storm sewer installation (12" and 15" pipes, inlets, manholes, and related drainage structures) - Sodding, seeding, and landscaping restoration (including Heritage River Birch trees) - Traffic control, earth excavation, subbase repair, and geotechnical fabric installation - Temporary and permanent mailbox installation and relocation - Water and utility adjustments (valve boxes, service boxes, frame and lid adjustments) - Erosion control and compliance with Stormwater Pollution Prevention Plan (SWPPP) and National Pollutant Discharge Elimination System (NPDES) permit - Notable Requirements: - Compliance with Illinois prevailing wage laws - Electronic bid submission via IONWAVE platform - 5% bid bond required - Adherence to City of Moline supplemental specifications and special provisions - Stormwater and environmental protection measures are mandatory - Project duration is 80 working days - OEMs and Vendors: - No specific OEMs or proprietary manufacturers are named; standard construction materials and equipment are specified - Products/Services Requested (selected major line items): - PCC Pavement, 7" w/Integral Curb: 5,594.7 sq yd - Aggregate Base Course, Type B, 6": 6,110.1 sq yd - PCC Driveway Pavement: 1,380.6 sq yd - PCC Sidewalk, 4": 10,271.9 sq ft - PCC Sidewalk Ramp, 6": 990.1 sq ft - Storm Sewer, 12": 136 ft; Storm Sewer, 15": 190 ft - Sodding Special Complete: 1 LS - Temporary Cluster Mailbox: 4 each - Trees, Heritage River Birch: 5 each - Traffic Control, Earth Excavation, Subbase Repair, and related services - Unique/Notable Aspects: - Emphasis on environmental compliance (SWPPP, NPDES) - Multiple utility and drainage adjustments - Detailed restoration and landscaping requirements - All work must comply with state and local regulations
Description
The City of Moline is seeking bids for the reconstruction of 27th Avenue A, 28th Avenue A, and 30th Street in the Old Oakwood Subdivision. The project includes removal and replacement of PCC pavement on three residential streets, sidewalk replacement, driveway replacement, storm sewer installation, sodding, and related work. The contractor will have 80 working days to complete the project, with contract execution expected at the July 21st, 2026 City Council meeting. Prevailing wages are required as per Illinois law. Bidding is conducted electronically through the IONWAVE website, with a virtual bid opening scheduled.