Opportunity

Sound Transit Biddingo #CN 0072-21

Sound Transit PIMS Sounder Civil Structural Upgrades for Variable Messaging Signs at 12 Stations

Posted

August 09, 2021

Respond By

September 02, 2021

Identifier

CN 0072-21

NAICS

237130, 237990

Sound Transit is seeking contractors for civil and structural upgrades at 12 Sounder Commuter Rail Stations to support new and upgraded Variable Messaging Signs (VMS) as part of the Passenger Information Management System (PIMS) initiative. - Government Buyer: - Central Puget Sound Regional Transit Authority (Sound Transit) - Project covers Everett, Mukilteo, Edmonds, King St, Tukwila, Kent, Auburn, Sumner, Puyallup, Tacoma Dome, South Tacoma, and Lakewood stations - Products and Materials Requested: - Replacement and installation of new poles with single-sided and double-sided VMS units - Pre-manufactured light pole assemblies (ASTM/AISC compliant) - Electrical conduits, junction boxes, and appurtenances (concealed installation) - Structural steel materials (wide flange shapes, HSS, tubes, pipe, bolts, anchor bolts, welding electrodes) - Non-shrink grout (5000-6000 PSI) - Stainless steel adhesive anchors and epoxied reinforcing bars (Hilti RE-500 or equivalent) - Services Requested: - Civil and structural installation, including mounting points, poles, arms, NEMA boxes, conduit paths, demolition of existing signs, and site restoration - Deinstallation/reinstallation of peripheral equipment (e.g., static signs, video cameras) - Saw-cutting, trenching, backfill, patch, and repair - As-built documentation and O&M manuals - Unique/Notable Requirements: - Compliance with all relevant building codes and Sound Transit standards - Special inspections required for structural work - Coordination with subsequent data/power work packages - Federally funded contract with small business and DBE participation goals - Scope and requirements vary by station - No specific OEMs for VMS or hardware are named; Hilti is referenced as an approved equivalent for adhesive anchors.

Description

This solicitation is for the PIMS Sounder Civil Structural Work at Sound Transit Sounder Commuter Rail Stations. The project involves preparing the structural infrastructure for mounting Variable Messaging Signs (VMS) at 12 Sounder Stations, including installation of mounting points, poles, foundation work, arms for hanging VMS, NEMA boxes, conduit paths, and demolition of existing signs. The work may also include deinstallation and reinstallation of peripheral equipment such as static signs or video cameras, as well as saw-cutting, trenching, conduit installation, backfill, patch, and repair. The scope varies by station and includes providing as-builts and operation and maintenance manuals.

View original listing