Opportunity

SAM #W912EE26QA028

Sole Source Replacement of Sewer Grinder Pump Station Components at Enid Lake, MS

Buyer

USACE Vicksburg District

Posted

June 25, 2026

Respond By

July 06, 2026

Identifier

W912EE26QA028

NAICS

237110, 237990, 333914

This opportunity involves the replacement of sewer grinder pump station components at Enid Lake, Mississippi, managed by the U.S. Army Corps of Engineers, Vicksburg District. - Sole source procurement is intended for Scoggins Welding & Machine Shop, Inc. (Cage Code: 10MC7) - Scope includes: - Removal and disposal of existing grinder pump station components (11 stations) - Supply and installation of new duplex grinder pump station components: - 11 fiberglass grinder pump basins (48" diameter x 72" depth, aluminum access lid) - 22 3-HP, 230V, single-phase grinder pumps (duplex configuration) - 22 stainless steel discharge piping assemblies - 11 duplex control panels (20x20 steel enclosure with panel stand and controls) - 11 universal guide rail systems (compatible with 1" and 2" vertical discharge pumps) - Assembly, electrical/mechanical connections, testing, and commissioning of each station - Two-year warranty on all work and components - All labor, tools, equipment, transportation, and materials are included - Period of performance is 180 days from award - No specific OEMs or part numbers are listed; interested parties may submit capability statements - Commercial opportunities exist for suppliers of grinder pumps, control panels, basins, and related components

Description

W912EE 

The U.S. Army Corps of Engineers -Vicksburg District (USACE-MVK), in accordance with Revolutionary FAR Overhaul (RFO) Part 12, Acquistion of Commercial products and Commerical Service, intends to award a sole source purchase order to Scoggins Welding & Machine Shop, Inc. (Cage Code: 10MC7) to provide all labor, tools, equipment, transportation, parts, materials, and other incidentals necessary for removal of the components of the existing sewer grinder pump stations and the installation of new, fully operational duplex grinder pump station components. The locations of services will occur in public access areas that are not sensitive areas nor personnel only areas. These locations are in various public recreation areas on the Enid Lake Project. Refer to the attached statement of work for complete requirement details. 

This is not a Request for Quote (RFQ), and no solicitation is available for this procurement. Nevertheless, any firm or individual that believes it is capable of meeting the Vicksburg District's requirements described herein may submit a capabilities statement, which, if received by 12:00 PM CST on 06 July 2026, will be considered. Responses to this posting must be submitted via e-mail, no phone calls will be accepted. A determination not to compete the described purchase order based upon responses to this notice is solely within the discretion of the Federal Government. Any questions or comments should be directed to Jasmine Lewis, via email at Jasmine.Lewis@usace.army.mil, and Dustin Cannda, via email at Dustin.G.Cannada@usace.army.mil

View original listing