Opportunity
SAM #SLAC_366191_BoosterChamber_Tubing
SLAC National Accelerator Laboratory Solicitation for Chamber Tubing
Buyer
SLAC National Accelerator Laboratory
Posted
June 25, 2026
Respond By
June 26, 2026
Identifier
SLAC_366191_BoosterChamber_Tubing
NAICS
332999, 3333, 332996
SLAC National Accelerator Laboratory, managed by Stanford University for the Department of Energy, is seeking quotes for specialized chamber tubing for scientific applications. - Government Buyer: - SLAC National Accelerator Laboratory (DOE Office of Science, operated by Stanford University) - Products Requested: - Seamless stainless steel tubes, part number PF-444-161-25_Rev.01 - Quantities and cut lengths: - 17.973 inches (90 units) - 4.89 inches (36 units) - 22.535 inches (9 units) - 25.095 inches (9 units) - 20.084 inches (8 units) - 17.525 inches (7 units) - Technical Requirements: - Tubes must be 316L seamless stainless steel or 347/316L welded tubes - Must conform to ASTM A269 or ASTM A240/A240M standards - Surface finish per ASTM A480/A480M, Finish 2B or better - Strict tolerances for diameter, wall thickness, and straightness - Weld bead, deburring, and cleaning specifications - Electropolishing and passivation required - No on-site services permitted; product supply only - Compliance and Certifications: - Buy American Act applies for items over $15,000 - Vendors must provide representations, certifications, HTS Code, and ECCN if applicable - Fixed price purchase order, NET-30 payment terms, FOB Destination - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation
Description
SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions.
Please review the quote and provide your best and final offer for both price and lead-time. Kindly also have the quotation revised to today’s date and address the quote to my attention.
The follow has been attached for you to complete and review:
Representations & Certifications Rider Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&Cs (August 2023) Drawing_PF-444-161-25_Rev1 SC-700-8660-47 Rev.19 SC-700-866-49 Rev. 5 INJ-98 Rev.6
Quote# Q_6425_Rev_5
Required item(s) listed below:
PF-444-161-25_Rev.01: Length of Tube 17.973 inches – QTY: 90 PF-444-161-25_Rev.01: Length of Tube 4.89 inches – QTY: 36 PF-444-161-25_Rev.01: Length of Tube 22.535 inches – QTY: 9 PF-444-161-25_Rev.01: Length of Tube 25.095 inches – QTY: 9 PF-444-161-25_Rev.01: Length of Tube 20.084 inches – QTY: 8 PF-444-161-25_Rev.01: Length of Tube 17.525 inches – QTY: 7
Quote is for product only; no on-site services permitted.
Source selection will be based on Lowest Price and Technically Acceptable Method (LPTA).
Technical evaluation criteria are as follows:
Material: 316L seamless stainless steel, redrawn from tube produced to ASTM A269 OR 347/316L welded tubes shall be made from strip conformed to ASTM A240/A240M, with surface finish per ASTM A480/A480M, Finish 2B or better. Final product to have outside tube diameter shall be 1.875″ +0.000″/−0.007″, and wall thickness shall be 0.012″ ±0.001″. (Drawing PF-444-161-25) Overall cut-tube length deviation shall be within ±0.005″ from the nominal specified value. Tubes shall be straight to a maximum deviation of 0.001″ per 1.0″ of tube length. (Applicable to tubing made of a flat strip only) The weld bead shall be a butt joint fusion TIG weld without the use of filler metal. During welding, an inert gas inside purge shall be used along with an inert gas trailing shield on the outside. Tolerance on weld bead projection after planishing shall not exceed 0.002″. Tubing shall be cut to final length using a method that does not deform or collapse the tube wall, and all resulting sharp edges shall be immediately deburred, producing a maximum radius of 0.005″. (Refer to SC-700-866-49) No silicon or sulfur-based cutting fluids shall be used as machining lubricants. Cutting fluids must be approved, as specified in the latest revision of SC-700-866-47. Surface finish of the final product shall not exceed 16 μin Ra (0.40 μm Ra) on the tube inner surface and shall not exceed 63 μin Ra (1.6 μm Ra) on the tube outer surfaces. Electropolished per ASTM B912 if mechanical polishing was used to achieve required surface finish. Passivated per ASTM A967 (corrosion resistance). No operation causing contaminants to be embedded into vacuum surfaces shall be permitted. Grinding with resin-bonded wheels, emery cloth, crocus cloth, or similar abrasives on vacuum surfaces is prohibited. Cleaning of vacuum surfaces at all stages shall use only approved solvents and methods; chlorinated, brominated, and sulfur-based solvents are prohibited. Fabricated in full accordance with INJ-98 Rev. 6, with quality records and inspections outlined.
Please provide a price and lead time quotation by COB 7/3/2026.
Please be advised that the requirement was also posted on SAM.gov.
Send quote to marissat@SLAC.stanford.edu.
Is there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions?
If possible, please provide a link to your webpage for published price list to substantiate for the prices quoted.
Buy American Act Certification (BAA) applies to items that have a unit price that is over $15,000. Representations & Certifications Rider is required. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return. Please include in your proposals the Harmonized Tariff Schedule (HTS Code) & ECCN if applicable. All subcontractors are required to register in the System for Award Management (www.sam.gov). The resulting purchase order will be issued on a fixed price basis. SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order. Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments). Freight terms will be FOB Destination Prepaid and Add Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid.
You are requested to mark and identify proprietary/confidential information provided in response to the solicitation.
Contact me directly with any questions.
Kind regards,
Marissa Tanomrat
Procurement Commodities Team
SLAC National Accelerator Laboratory
2575 Sand Hill Road
Menlo Park, CA 94025
Email: marissat@slac.stanford.edu