Opportunity
Worcester Worcester #8740-M7
Bridge Rehabilitation Services for Three Worcester Structures
Posted
October 04, 2023
Respond By
July 15, 2026
Identifier
8740-M7
NAICS
237310, 237990
This opportunity involves the rehabilitation of three bridges in Worcester, MA, managed by the City of Worcester's Department of Public Works and Parks. - Government Buyer: - City of Worcester, Department of Public Works and Parks, Purchasing Division - Project Scope: - Rehabilitation of June Street over Tatnuck Brook (Bridge No. W-44-003), Mower Street over Tatnuck Brook (Bridge No. W-44-001), and NE Cutoff over Poor Farm Brook (Bridge No. W-44-139) - Includes masonry arch, culvert, and concrete repairs; crack sealing and grout injection; spall repairs; slope stabilization; erosion control; sidewalk and pavement restoration; guardrail replacement; traffic management; pedestrian accommodations; and water control operations - Products/Services Requested: - Structure settlement monitoring - Pressure injection of cracks (epoxy adhesive) - Excavation and demolition (concrete, pavement) - Supply and installation of crushed stone, bituminous concrete, and modified rockfill - Installation and removal of guardrails, impact attenuators, barriers, and safety signage - Erosion control materials (geotextile fabric) - Cellular concrete and cementitious grout/mortar for structural repairs - Epoxy coated steel reinforcement - Water control and dewatering services - Notable Requirements: - Compliance with Massachusetts prevailing wage laws - Substantial completion required by November 15, 2027 - Prequalification by MassDOT for bridge construction - Bid security (5% of total bid) - Adherence to city policies (MWBE, wage theft prevention) - OEMs and Vendors: - No specific OEMs or manufacturers are named in the solicitation or attachments - Estimated Contract Value: - Approximately $395,848.09
Description
This project involves the rehabilitation of three bridge structures within the City of Worcester. The work includes masonry arch, culvert, and concrete repairs; crack sealing and grout injection; spall repairs; slope stabilization and erosion control; sidewalk and pavement restoration; guardrail replacement; traffic management and pedestrian accommodations; water control operations; and all associated incidental work necessary to restore and improve the structural integrity and safety of the bridges. The specific bridges are June Street over Tatnuck Brook (Bridge No. W-44-003), Mower Street over Tatnuck Brook (Bridge No. W-44-001), and NE Cutoff over Poor Farm Brook (Bridge No. W-44-139). The estimated cost is $395,848.09.