Opportunity

Saskatchewan Tenders #07-64-2471061

Northlands College 80KW Stand-by Diesel Generator Installation and Site Upgrades

Posted

June 25, 2026

Respond By

July 14, 2026

Identifier

07-64-2471061

NAICS

238210

Northlands College in Air Ronge, Saskatchewan, is seeking bids for a comprehensive generator installation project at its River Campus head office. - Government Buyer: - Northlands College, Head Office River Campus, Air Ronge, SK - Project Scope: - Supply and installation of a new 80KW stand-by diesel generator with winterized housing - Installation of new electrical main fusible switch, CT cabinet, and utility meter (all exterior mounted adjacent to the generator) - Installation of a 400Amp transfer switch inside the building - Placement of the generator on a new concrete pad within a chain link fence compound - Disconnection and removal of existing parking rail power and electric vehicle charger cabling - Installation of three new parking pedestals to replace the existing parking rail - All disposal, materials, equipment, and labor included in contract price - Contractor responsible for code compliance and use of certified trades personnel - Products/Services Requested: - 80KW stand-by diesel generator (1 unit) - Winterized housing for generator - Electrical main fusible switch (1 unit) - CT cabinet (1 unit) - Utility meter (1 unit) - 400Amp transfer switch (1 unit) - Concrete pad (1 unit) - Parking pedestals (3 units) - Installation services for all above components - Unique/Notable Requirements: - All work must comply with applicable codes and standards - Use of certified trades personnel is mandatory - Contractor must handle all disposal and site preparation - No specific OEMs or part numbers are specified in the solicitation

Description

Northlands College is soliciting bids for the installation of a new 80 Kw stand-by diesel generator at the college head office located at the River Campus in Air Ronge, Saskatchewan. The work includes providing and installing the generator with winterized housing, a new electrical main fusible switch, CT cabinet, utility meter, and a 400Amp transfer switch inside the building. The generator will be placed on a new concrete pad within a chain link fence compound. The project also involves disconnecting and removing existing parking rail power and electric vehicle charger cabling, with replacement of the parking rail by the owner's group and installation of three new parking pedestals. All disposal, materials, equipment, and labor must be included in the contract price, and the contractor is responsible for code compliance and use of certified trades personnel.

View original listing