Opportunity

Hawaii eProcurement Portal #B26003484

Hawaii DOT Freeway Management System Phase 4: CCTV and Fiber Optic Upgrades on Oahu

Posted

June 24, 2026

Respond By

July 31, 2026

Identifier

B26003484

NAICS

237990, 238210

The Hawaii Department of Transportation, Highways Division, is seeking contractors for the Freeway Management System Phase 4 project on Oahu, focused on upgrading traffic monitoring and communications infrastructure. - Government Buyer: - Hawaii Department of Transportation, Highways Division - Design Project Manager: Neal Honma - Project Scope: - Replacement of 72 existing closed-circuit television (CCTV) cameras along H-3 Freeway and within the Tetsuo Harano Tunnel - Installation of 5 new CCTV cameras across H-3, H-201, H-1 Freeways, and Pali Highway - Installation and replacement of corridor-wide fiber optic trunk communication cable and conduit (including 72-strand and 12-strand single mode fiber optic cables, 3-cell fabric innerduct, and extended range Ethernet cable) - Upgrades to operator equipment at the Tetsuo Harano Tunnel traffic operations center (2 new workstations, new video switch, new video wall display) - Installation of fiber optic conduit between Kalihi Interchange and Houghtailing Street on H-1 Freeway - Related electrical, communication, and traffic control infrastructure improvements - Products/Services Requested: - CCTV camera assemblies (PTZ and fixed), cabinet enclosures, ITS enclosures, hub cabinet enclosures - Fiber optic cables (72-strand, 12-strand, LSZH), innerduct, Ethernet cable, and associated network hardware - Construction services for installation, trenching, backfilling, and restoration - Traffic control, guardrail, and power supply upgrades - Unique/Notable Requirements: - Compliance with federal wage determinations and Buy America provisions - Valid State of Hawaii General Engineering A license required - No night work permitted from September 15 to December 15 - Warranty period for equipment begins after acceptance, with a 30-day observation period for CCTV cameras - Project duration is approximately 12 months (410 working days) - No specific OEMs or vendors are named in the solicitation; the project is open to qualified contractors and suppliers of traffic management and fiber optic communication equipment.

Description

This project involves the replacement of 72 existing CCTV cameras along the H-3 Freeway and within the Tetsuo Harano Tunnel, installation and replacement of the corridor-wide fiber optic trunk communications cable, installation of two new CCTV cameras on the H-3 Freeway, and operator equipment upgrades at the Tetsuo Harano Tunnel traffic operations center. The work also includes the installation of a fiber optic conduit between the Kalihi Interchange and Houghtailing Street on the H-1 Freeway. The project aims to improve freeway operations and traffic management on Oahu's freeways.

View original listing