Opportunity

Lone Star College System Ionwave #CSP 26-05-04 Addendum 3

Lone Star College North Harris seeks fabrication and installation of illuminated exterior marquee signs

Posted

May 28, 2026

Respond By

July 07, 2026

Identifier

CSP 26-05-04 Addendum 3

NAICS

339950, 238990, 238210

Lone Star College System (North Harris Campus) is seeking competitive proposals for the fabrication and installation of three illuminated exterior marquee signs, known as the "Star of Tomorrow" project. - Government Buyer: - Lone Star College System, North Harris Campus, Procurement Department - Contact: Lydia Sterling, Senior Commodity Manager - Project Scope: - Fabrication and installation of three illuminated channel letter marquee signs: - Two signs for the campus Clock Tower - One sign for the Student Services Building entrance - Signs must feature face-lit aluminum channel letters/logos with internal white LED illumination and weather-resistant finishes - Includes all labor, materials, equipment, supervision, permitting, site visits, and site restoration - Electrical work: wiring, transformers, drivers, controllers, integration with existing lighting controls, and waterproof sealing of facade penetrations - Compliance with NEC, local codes, and OSHA safety standards - Submittals required: shop drawings, product data, material samples, and as-built drawings - Minimum 2-year warranty on labor and materials - OEMs and Vendors: - No specific OEMs for signage or LED components are named - Matthews Paint (MP32156 Black Magic) is specified for sign finishes - Hubbell is referenced for tamper-resistant electrical receptacles - Notable Requirements: - Contractor must be licensed in Texas and carry insurance - Coordination with campus facilities and restoration of any site damage - Evaluation based on price, experience, technical approach, schedule, and safety - Estimated contract value: $240,000

Description

This solicitation is for the fabrication and installation of three illuminated marquee signs at Lone Star College-North Harris. The project includes mounting two signs on the campus Clock Tower and one sign at the Student Services Building entrance. The work involves structural mounting, electrical wiring, and integration with existing lighting controls. The contractor is responsible for site visits, safety, permitting, quality control, and site restoration. Proposals must include qualifications, experience, schedule, safety plan, and references.

View original listing