Opportunity

SAM #W911S226U3498

Army Solicitation for Fire Attack Skid Unit for Ford F550 at Fort Hood

Buyer

MICC-Ft Drum

Posted

June 24, 2026

Respond By

July 01, 2026

Identifier

W911S226U3498

NAICS

336999, 333914

This procurement opportunity is issued by the Mission Installation Contracting Command (MICC) at Fort Drum, representing the Department of the Army, for a fire attack skid unit for a 2016 Ford F550 at Fort Hood, Texas. - Government Buyer: - Department of the Army, Mission Installation Contracting Command (MICC), Fort Drum - OEMs and Vendors: - Darley (OEM specified for the 2BE Fast Attack 2 skid unit) - Equivalent products from other manufacturers are acceptable - Products/Services Requested: - Fire attack skid unit (2026 or newer Darley 2BE Fast Attack 2, option 2, or equivalent) - 21HP engine with electric start and exhaust primer - 200-gallon poly water tank - Illuminated pressure gauge - Welded stainless steel auxiliary suction and manifold - Electric booster reel with 100 feet of 1-inch booster hose - All required tank and pump connections - Freight, removal of existing skid unit, installation of new unit at a dealer/outfitter within 75 miles of Fort Hood, and operational orientation - Unique/Notable Requirements: - Skid unit must be compatible with a 2016 Ford F550 - Installation and orientation must occur at a location within 75 miles of Fort Hood, Texas - Removal of the existing skid unit is included in the scope - Equivalent products to the Darley 2BE Fast Attack 2 are permitted, broadening competition

Description

New unit, 2026 or newer Darley 2BE Fast Attack 2 (option 2) or equivalent skid unit. Shall be compatible with a 2016 Ford F550 replacing existing skid unit. 21HP has engine with electric start, exhaust primer; 200 gallon poly water tank; Illuminated pressure gauge; 2.5in welded stainless steel auxiliary suction with 2.5in adapter; 2.5in tank to pump; All welded stainless steel manifold; 1in tank fill; 1in pump to booster reel; 1.5in NST discharge; Electric booster reel with 100ft of 1in booster hose. Final price shall include freight, labor to remove existing skid unit, labor to install new skid unit at a dealer/outfitter within 75 mile radius of Ft Hood TX (76544), and orientation on new skid unit operations. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W911S226U3498Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module

View original listing