Opportunity

SAM #80NSSC26936775Q

NASA Langley – MTS FlexTest 40 Controller System Upgrade and Installation

Buyer

NASA Shared Services Center

Posted

June 24, 2026

Respond By

June 26, 2026

Identifier

80NSSC26936775Q

NAICS

334519, 541511, 541330, 541512

NASA Langley Research Center is seeking to upgrade and install an MTS FlexTest 40 controller system for its SATEC 600-kip load frame. - Government Buyer: - NASA Langley Research Center - OEM Highlight: - MTS Systems Corporation is the primary OEM for all hardware and software components - Products Requested: - MTS FlexTest 40 Controller (Part #100207564) – Qty: 1 - Handset Model 494.05 (Part #100292300) – Qty: 1 - Handset Cable Assembly 7.5m (Part #56984902) – Qty: 1 - Handset Retainer with Mounting Screws (Part #100188282) – Qty: 1 - MTS Computer, Windows 11, 64GB RAM, 2x512GB HDD (Part #100693951) – Qty: 1 - MTS Supplied 27" LCD Monitor (Part #100330545) – Qty: 1 - Controller Software: 793.10 MultiPurpose TestWare (MPT) (Part #100076457) – Qty: 1 - Wedge Grip Set Model 647.50, 500 kN (Part #47595505) – Qty: 1 - Wedge Set Model 647.50, Wide Flat, Diamond, 500 kN (Part #48966304) – Qty: 1 - Hydraulic System Intensifier Model 685.60C-03 (Part #57597902) – Qty: 1 - Attachment Kit: Grip to Actuator (Part #52101049) – Qty: 1 - Attachment Kit: Grip to Load Cell (Part #52101051) – Qty: 1 - Services Requested: - Onsite installation, commissioning, and calibration (40 hours) - Onsite basic operator training (1 session) - Onsite calibration to ASTM standards (1 session) - Unique/Notable Requirements: - All hardware and software must be compatible with the SATEC 600-kip load frame - Onsite services must be performed by MTS Field Service Engineers - Calibration must meet ASTM standards - Period of Performance: - 14 months after receipt of order

Description

** THIS IS A SOLE SOURCE REQUIREMENT ** for FY26 MTS Purchase

View original listing