Opportunity

Massport #P26-3636-C6A

Lake Wyola State Park Shade Pavilions and Site Improvements Construction

Posted

June 24, 2026

Respond By

July 30, 2026

Identifier

P26-3636-C6A

NAICS

237310, 238990

This opportunity is for construction and site improvements at Lake Wyola State Park, managed by the Massachusetts Department of Conservation and Recreation (DCR). - Government Buyer: - Commonwealth of Massachusetts, Department of Conservation and Recreation (DCR), Division of Design and Engineering - Scope of Work: - Installation of three small timber shade pavilions (south end) and one medium pavilion (north end) - Use of owner-supplied lumber for pavilions, with additional locally sourced timber as needed (graded by NELMA-certified graders) - Construction of accessible paths, boardwalks, and parking improvements - Procurement and installation of picnic tables, grills, benches, and site furnishings - Installation of wood post and rail fencing (split rail, black locust posts, northern white cedar rails) - Landscaping: procurement, installation, and maintenance of trees, shrubs, perennials, bulbs, groundcovers, and seeding/establishment of lawn and meadow areas (with one-year guarantee) - Site clearing, tree protection, erosion and sedimentation controls (straw wattles, silt fencing, stabilized entrances) - Earth moving, excavation, backfill, grading, and asphalt paving (walkways, ramps, curbs, ADA compliance) - Installation of metal roof panels (preformed steel, concealed fasteners, fluoropolymer finish) and metal fabrications (brackets, connectors, fasteners) - Traffic signage (aluminum signs, high-intensity prismatic sheeting, galvanized steel posts), pavement markings, and precast concrete wheel stops - Polyurethane joint sealants for exterior joints (3-year warranty) - Notable Requirements: - Estimated contract value: $891,000 - Completion required within 273 calendar days from notice to proceed; $500/day liquidated damages for late completion - Supplier diversity goals: 6% MBE, 10% WBE, 3% VOBE participation - Local workforce goals: 15.3% minorities, 6.9% women - Bidders must be pre-qualified by MassDOT Highway Division in Recreational Facilities - Subject to Massachusetts prevailing wage laws - One-year warranty on plantings and construction - No specific OEMs or commercial vendors are named; materials must meet specified standards (e.g., NELMA grading, ADA compliance, fluoropolymer finish for metal roofs)

Description

Project Shade at Lake Wyola State Park involves installation of tree protection, construction fencing, erosion control, three small shade pavilions at the south end, one medium pavilion at the north end, accessible paths, boardwalks, parking improvements, picnic tables, grills, fencing, and landscaping. The project cost is approximately $891,000, with completion within 273 days of notice to proceed. Bidders must be pre-qualified by MassDOT in Recreational Facilities. The contract includes MBE (6%), WBE (10%), and VOBE (3%) participation requirements, with local workforce goals of 15.3% for minorities and 6.9% for women. Bids must include a 5% bid deposit.

View original listing