Opportunity

Bettendorf Ionwave #2026-0014 Addendum 1

City of Bettendorf 2026 Alley Rehabilitation Program – Bid Opportunity

Posted

June 16, 2026

Respond By

July 07, 2026

Identifier

2026-0014 Addendum 1

NAICS

237310, 238990

The City of Bettendorf, Iowa, Engineering Division of the Public Works Department is seeking bids for the 2026 Alley Rehabilitation Program, covering the rehabilitation of two alley segments totaling approximately 1,700 linear feet. - Government Buyer: - City of Bettendorf, Engineering Division of the Public Works Department - Project Scope: - Rehabilitation of two alley segments (approx. 1,700 linear feet, widths 10–14 feet) - Work includes: - Milling of existing surfaces (rotomilling) - Placement of granular subbase and stabilization materials - Hot Mix Asphalt (HMA) resurfacing (base and surface courses) - Partial construction and replacement of driveways (P.C.C. and brick) - Storm sewer and intake installation (including new and adjusted intakes, storm pipes, manholes, trench drains, drain tile) - Sidewalk, curb, and gutter work - Sodding, fertilizing, topsoil, and landscaping restoration - Temporary traffic control and erosion/sediment control - Products & Quantities (selected major line items): - Rotomilling: 1,404 units - HMA Standard Traffic (ST) Base, 3/4", PG 58-28S: 463 units - HMA Standard Traffic (ST) S-I, 3/8", PG 58-28H: 309 units - Granular Subbase, Grad 14 (12"): 1,605 units - P.C.C. Driveway, 6": 894 units - Storm Pipe (15"): 535 units; (18"): 183 units - Alley Intakes, New: 6 units - Trench Drain, New: 29 units - Sodding and Fertilizing: 650 units - Notable Requirements: - Strict adherence to city and SUDAS specifications - Coordination with multiple utility companies for potential conflicts - Rock excavation due to utility conflicts (Class 12 Excavation) - Performance and maintenance bonds required - Liquidated damages of $500 per day for delays - Contractor eligibility for future city projects may be affected by performance - OEMs and Vendors: - No specific product OEMs are named for materials; utility companies are involved for coordination only - Estimated Contract Value: - Engineer's estimate for Addendum 1: $620,716.00

Description

This solicitation is for the rehabilitation of two alley segments totaling approximately 1700 linear feet, with widths ranging from 10 to 14 feet. The work includes milling the existing surface, placing granular subbase, resurfacing with Hot Mix Asphalt (HMA), partial driveway construction, storm sewer and intakes installation, sodding, and related reconstruction activities. The project start date is on or after July 27, 2026, with completion required by November 20, 2026. Liquidated damages of $500 per day apply for delays beyond the completion date.

View original listing