Opportunity

SAM #FGWB21000AB_3

Airfield Stormwater System Repair and Maintenance at Dobbins ARB

Buyer

94th Contracting Flight

Posted

June 24, 2026

Respond By

August 10, 2026

Identifier

FGWB21000AB_3

NAICS

237990, 237110, 238110

This opportunity from the Department of the Air Force Reserve Command at Dobbins Air Reserve Base seeks contractors for Phase II of the airfield stormwater system repair and maintenance project. - Government Buyer: - Department of the Air Force, Air Force Reserve Command, 94th Contracting Flight - Contact: Kevin Song, Contract Specialist - Scope of Work: - Repair and maintain stormwater drainage systems east of Taxiway 'J' - Regrading failed or disturbed slopes - Application of sod for slope stabilization - Cleaning existing flumes, pipes, and swales - Installation of new concrete flumes at multiple locations - Work covers basins III, IV, and V on the airfield - Requirements: - Contractor must provide all materials, equipment, labor, supervision, and incidentals - Project aims to reestablish proper drainage patterns and prevent erosion/standing water - Notable Details: - No specific OEMs or vendors are named - Firm-fixed-price contract - Set aside 100% for small businesses - Estimated contract value between $10M and $25M - Period of Performance: - 420 calendar days from award date

Description

While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.

View original listing