Opportunity
SAM #FA254326Q0010
Buckley SFB Cooling Infrastructure Repair Materials Procurement
Buyer
460th Contracting Squadron
Posted
June 23, 2026
Respond By
July 08, 2026
Identifier
FA254326Q0010
NAICS
423720, 423740, 423730, 332996
The U.S. Space Force, through the 460th Civil Engineer Squadron and 460th Contracting Squadron at Buckley Space Force Base, is seeking quotes for specialized cooling infrastructure repair materials. - Government Buyer: - U.S. Space Force - 460th Civil Engineer Squadron - 460th Contracting Squadron (Buckley Space Force Base) - Products/Services Requested: - Elbow and Pipe Repair Package - Includes carbon steel pipe repair clamps in various sizes and angles - Rated for 80 PSI water pressure, epoxy coated or with neoprene sealing - Must comply with ASME PCC-2, ISO 24817, and ASME B13 standards - Quantity: 1 package - Part Number: 0001 (per Statement of Need) - Pipe Freezing Kit - Utilizes liquid CO2 or liquid nitrogen to freeze water in pipes (3/8" to 10" diameter) - Includes hoses, valve adapters, timing boards - Must comply with ASME PCC-2, ISO 24817, and ASME B13 standards - Quantity: 1 kit - Part Number: 0002 (per Statement of Need) - Carbon Fiber Composite Reinforcement Package - Field-saturated composite system for sealing leaks on steel pipes (3" to 10" diameter, up to 200°F) - Includes 12" x 50-yard carbon fiber cloth, two-part epoxy, filler, and surface prep equipment - Must comply with ASME PCC-2, ISO 24817, and ASME B13 standards - Quantity: 1 package - Part Number: 0003 (per Statement of Need) - Unique/Notable Requirements: - All items must be new, commercial off-the-shelf (COTS) - Compliance with ASME and ISO standards is mandatory - Delivery required within 14 days after receipt of order; staggered delivery possible for custom items - 100% small business set-aside; award based on Lowest Price Technically Acceptable (LPTA) - No specific OEMs or vendors are named in the solicitation or attachments.
Description
The 460th Civil Engineering Squadron, Buckley SFB, requires various carbon steel pipe repair clamps from 3" to 10", a pipe freezing kit for pipes ranging from 3" to 10", and a carbon fiber composite reinforcement package for pipes from 3" to 10".
Please see the attached Statement of Need for product salient characteristics/specifications and other requirements.