Nevada Ionwave #PWP CC-2026-419 Addendum 1
Runway Safety Area Grading, Drainage, and Airfield Lighting Upgrades at Carson City Airport
Posted
June 02, 2026
Respond By
July 07, 2026
Identifier
PWP CC-2026-419 Addendum 1
NAICS
237310, 237130, 237990
Carson City Airport Authority is seeking bids for a comprehensive Runway Safety Area Grading and Drainage Project at Carson City Airport. - Government Buyer: - Carson City Airport Authority - Project Scope: - Removal of existing unpaved runway shoulders and installation of new asphalt paved shoulders (12,816 SY) - Grading of adjacent infield for positive drainage (1,150 CY excavation/embankment, 3,250 CY export, 1,400 CY unsuitable excavation contingency) - Installation of aggregate base course (12,816 SY, 6" thick) and hot mix asphalt surface course (12,816 SY, 3" thick) - Pavement markings (18,600 LF) - Electrical work including: - Installation of 101 L-867B base cans in new shoulders - Removal/reinstallation of 60 L-862 elevated runway edge lights and 41 L-861T elevated taxiway edge lights - Installation of 72 new L-861(L) elevated runway edge lights with new transformers - 7.5 KW constant current regulator (CCR) with vault modifications - 12,417 LF of 1-1/C No. 8 AWG, 5 kV, L-824C cable and #6 solid bare copper counterpoise - 500 LF of 2" concrete-encased electrical conduit - Demolition, temporary electrical, and miscellaneous electrical work - Products/Services Requested: - FAA-specified airfield lighting and electrical components (L-867B, L-862, L-861T, L-861(L), CCR) - Asphalt paving, grading, drainage, and pavement marking services - Unique/Notable Requirements: - Strict compliance with FAA specifications and Buy American/Build America (BABA) requirements - Adherence to Davis-Bacon and state prevailing wage rates (higher rate prevails) - Construction Safety and Phasing Plan (CSPP) and coordination with airport operations - Work restricted to nighttime hours (8:00 PM to 6:00 AM) - Project completion within 47 calendar days during the 2026 construction season - Bid bond of at least 5% required; award based on lowest responsive bid - No specific OEMs are named, but FAA-standard airfield lighting equipment is required, likely involving specialized manufacturers.
Description
The Carson City Airport is soliciting sealed bid proposals for the Runway Safety Area Grading and Drainage Project. The project involves removing existing unpaved shoulders and replacing them with asphalt paved shoulders, grading adjacent infield to provide positive drainage, striping new runway edge lines, and adjusting existing runway edge lights and miscellaneous electrical to grade. The project is federally funded through the FAA and subject to BABA requirements. A non-mandatory pre-bid meeting and site visit will be held on June 19, 2026, and sealed bids are due by July 7, 2026.