Opportunity
SAM #19AS2026Q0020
Driveway and Stormwater Drainage Rehabilitation for U.S. Embassy Canberra DCMR
Buyer
U.S. Embassy Canberra
Posted
June 23, 2026
Respond By
August 06, 2026
Identifier
19AS2026Q0020
NAICS
812930, 237310, 237110, 237990, 238910
This opportunity is issued by the U.S. Embassy Canberra, under the Department of State, for the rehabilitation of the Deputy Chief of Mission Residence (DCMR) driveway and stormwater drainage system in Canberra, Australia. - Government Buyer: - U.S. Department of State, U.S. Embassy Canberra, GSO Procurement Office - Scope of Work: - Investigation, repair, and upgrade of stormwater drainage infrastructure (pipes, pits, channels, trench drains, kerbs) - Full removal and replacement of deteriorated asphalt pavement (minimum 50 mm compacted thickness, including wearing and binder courses) - Subgrade and base course rehabilitation (removal of unsuitable materials, supply and compaction of new base course) - Replacement of existing stone edging with 150 mm wide concrete kerbs for improved edge restraint and durability - Entrance apron asphalt works - Full site restoration, including landscaping, irrigation, lighting, and utilities - Contractor Requirements: - Provide all labor, materials, equipment, permits, and supervision - Responsible for coordination, testing, and quality control - No specific OEMs, brands, or part numbers are specified in the solicitation - Estimated contract value: $90,000 to $180,000 USD - Period of performance: Work must begin within 10 days of notice to proceed and be completed within 75 days; residence will be unoccupied during construction
Description
DCMR Driveway and Stormwater Drainage Rehabilitation. Work includes stormwater drainage investigation, repair, and upgrade; full removal and replacement of deteriorated asphalt pavement (minimum 50 mm compacted thickness); subgrade and base course rehabilitation; replacement of existing stone edging with 150 mm concrete kerbs; entrance apron asphalt works; and full site restoration of landscaping, irrigation, lighting, and utilities. The contractor shall furnish all labor, materials, equipment, and miscellaneous costs required to complete the installation as specified herein..
Please refer to Section B for the detailed Statement of Work.