Opportunity
SAM #W9123726QA039
Piggyback Crane Repairs at Meldahl Locks and Dam
Buyer
USACE Huntington District
Posted
June 22, 2026
Respond By
July 10, 2026
Identifier
W9123726QA039
NAICS
811310
This opportunity from the U.S. Army Corps of Engineers, Huntington District, focuses on piggyback crane repairs at Meldahl Locks and Dam in Felicity, Ohio. - Government Buyer: - U.S. Army Corps of Engineers, Huntington District (ENDIST HUNTINGTON) - Scope of Work: - Repair services for a piggyback crane - Replacement of hydraulic swivel coupling and trolley hydraulic hoses - Replacement of existing brackets with draw chains - All components must be new - Contractor to furnish all labor, equipment, access, and materials - Contractor responsible for handling, maintaining, storing, and protecting materials/equipment until installation and acceptance - Post-installation testing and remediation until crane is fully operational - Crane system must be de-energized and secured before work begins - Coordination required for Lock-Out Tag-Out (LOTO) procedures - OEMs and Vendors: - No specific OEMs, vendors, or part numbers are mentioned - Unique Requirements: - All replacement components must be new - Strict safety and LOTO procedures required - Contractor must ensure full operational status after repairs - No administrative or procedural details included in requirements
Description
This work consists of furnishing all labor, equipment, access, and materials for replacing the hydraulic swivel coupling and trolley hydraulic hoses that operate the hydraulic swivel coupling on the piggyback crane meeting the requirements of this specification at Meldahl Locks and Dam. The existing brackets shall be replaced by the contractor with draw chains. All components shall be new. The Contractor shall be responsible for the proper handling, maintenance, storage and protection of all materials and equipment until installed and accepted. Once all these items are installed, the Contractor shall test the crane to ensure the crane operates without further issues to these components. Contractor shall remedy any issues and retest until the crane is returned to service. Prior to any work being performed, the Contractor shall ensure that all crane operating machinery is properly secured and all components immobilized to prevent damage. The crane system must be de-energized prior to removal. Coordinate with the Project Personnel to properly Lock-Out Tag-Out (LOTO) the equipment being serviced. See attached photographs for further details. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W9123726QA039Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module