Opportunity

New York State Contract Reporter #D202646

ADA Renovation and Facility Upgrades at Moon Library, SUNY ESF

Posted

June 22, 2026

Respond By

July 22, 2026

Identifier

D202646

NAICS

236220, 238220, 238210, 562910

This opportunity involves a major renovation project at the Moon Library, SUNY College of Environmental Science & Forestry, focused on ADA accessibility and facility upgrades. - Government Buyer: - State University of New York (SUNY), College of Environmental Science & Forestry, Facilities Planning, Design and Construction - Scope of Work: - Renovation and reconfiguration of lower level entries and restrooms for ADA compliance - Creation of a new student space with flexible furnishings, enhanced lighting, and updated technology infrastructure - Construction of a new fully accessible north entrance with vestibule and a vestibule addition to the south entrance - Selective demolition, hazardous materials abatement (asbestos, PCB caulk, lead), concrete and masonry work, structural steel framing, carpentry, waterproofing, insulation, joint sealants, and installation of new doors and frames - Upgrades to plumbing, HVAC, electrical, fire alarm, and communications systems - OEMs and Vendors Mentioned: - American Standard (water closets, urinals, lavatories) - Sloan (flush valves, faucets) - JR Smith (traps, drains, cleanouts) - Chicago Faucet (faucets) - McGuire (mixing valves) - Elkay (sinks, faucets, water coolers) - Fiat (service basins) - Woodford (hose bibbs, wall hydrants) - Guy Gray (washing machine boxes) - Products/Services Requested: - Multiple plumbing fixtures (e.g., ADA water closets, urinals, lavatories, sinks, service basins, water coolers) - Hazardous materials abatement (asbestos, lead, PCB caulk) - Concrete, masonry, and structural steel work - HVAC, electrical, and fire alarm system upgrades - Unique/Notable Requirements: - Strict compliance with NYSDOL, OSHA, NFPA, and EPA regulations for hazardous materials and safety - MWBE participation goal of 30% and SDVOB goal of 6% - Daily OSHA air monitoring during abatement - Detailed progress scheduling and reporting - Liquidated damages for delays - No specific quantities for most fixtures; hydraulic cement underlayment specified at 20,000 units

Description

This project involves the renovation and reconfiguration of the lower level of the Moon Library to enhance accessibility, functionality, and the overall student experience. The scope includes complete renovation of existing toilet rooms to meet current accessibility standards and improve fixtures, finishes, and layout efficiency. A new dedicated student space will be created to support individual and collaborative study, with flexible furnishings, improved lighting, and updated technology infrastructure. The project also includes a new fully accessible entrance on the north side with a vestibule for weather protection and universal access, and a new vestibule at the existing south entrance to enhance thermal performance and provide a welcoming entry sequence. Overall, the improvements aim to modernize the facility, increase accessibility and code compliance, and create a more comfortable, inclusive, and functional environment.

View original listing